St Joseph-CS030122DEVELOPMENT FEE TABLE
Project: Lots 1-4 Block A St. Joseph Village (Phase lA) Irrigation Meters
Date: 1/22/2003
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $4,480.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $410.56
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due at Issuance of Buildin Permit)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Buildin Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Buildin Permit)
Park Fee* $0.00 $0.00
(100% due rior to Council A royal)
Roadway Impact Fee $0.00 $0.00
'(100% due rior to Council A royal)
Street Light Fee Information not Ava ilable
(100% due rior to Acce tance of Project)
Street Sign Fee Information not Available
(100% due rior to Acceptance of Project)
Construction Inspection Fee Only Grading & Utility Paid
(100% due rior to Start of Construction)
TOTAL $5,050.56
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Lots 1-4 Block A St. Joseph Village (Phase lA) Irrigation Meters
DATE: 1/22/2003
Water Impact Fee:
Domestic Meter(s): 0 = 0 ESU's
Irrigation Meter(s): 2 - 2 inch = 16 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 16 ESU's @ $280.00 ea. $4,480.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea. $100.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 8x4 combo meters @ $0.00 $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 2 Irrigation Meter(s) @ $205.28 $410.56
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Fireline Meter(s) @ $0.00 $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea. $0.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea. $60.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0 @ $280.00 ea. $0.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Oniy):
* Preliminary plat approved: After October 26,1993
Park Development Zone : Zone 2
0 Single-famity (c~ $1,285.00 per lot $0.00
0 Multi-family (c~ $1,285.00 per unit $0.00
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations) $0.00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. Information not Available
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way. Information not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment. Only Grading & Utility Paid
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)