St Joseph-CS030122DEVELOPMENT FEE TABLE Project: Lots 1-4 Block A St. Joseph Village (Phase lA) Irrigation Meters Date: 1/22/2003 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,480.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $410.56 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due at Issuance of Buildin Permit) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Buildin Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Buildin Permit) Park Fee* $0.00 $0.00 (100% due rior to Council A royal) Roadway Impact Fee $0.00 $0.00 '(100% due rior to Council A royal) Street Light Fee Information not Ava ilable (100% due rior to Acce tance of Project) Street Sign Fee Information not Available (100% due rior to Acceptance of Project) Construction Inspection Fee Only Grading & Utility Paid (100% due rior to Start of Construction) TOTAL $5,050.56 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 DEVELOPMENT FEE WORKSHEET PROJECT: Lots 1-4 Block A St. Joseph Village (Phase lA) Irrigation Meters DATE: 1/22/2003 Water Impact Fee: Domestic Meter(s): 0 = 0 ESU's Irrigation Meter(s): 2 - 2 inch = 16 ESU's 0 = 0 ESU's Fireline Meter(s): 0 = 0 ESU's Total #: 16 ESU's @ $280.00 ea. $4,480.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. $100.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 8x4 combo meters @ $0.00 $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 2 Irrigation Meter(s) @ $205.28 $410.56 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 0 Fireline Meter(s) @ $0.00 $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. $0.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. $60.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $280.00 ea. $0.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. $0.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. $0.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Oniy): * Preliminary plat approved: After October 26,1993 Park Development Zone : Zone 2 0 Single-famity (c~ $1,285.00 per lot $0.00 0 Multi-family (c~ $1,285.00 per unit $0.00 (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) $0.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Only Grading & Utility Paid The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2