Amberpoint BP 2-LR021230 (2)REPORT OF REINFORCING STEEL OBSERVATION
'll'erracan
Consulting Engineers & Scientists
8901 Carpenter Fr~y., Suite ~tgO
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
12/30/02
3181
Transwestem Commercial Services
5001 Spring Val'ley Rd Ste 600W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021380.0175
94021380
Staples
20 L Northpoint
Coppell, TX
Services:
Drawings Utilized:
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
S2.1
Locations/Items Observed: Panels #39 to #41, #67 to #74, #108 to #112 and #136 to #143
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Placing Drawings Approved X Length and Shape Column Tie Spacing & Type
Bar Size X Proper Placement Stirrup Spacing & Type X~
Bar Grade X Properly Tied
Rebar Clean X Dowel Bars in Place X Welded Splices
Form Clean X Proper Supports X Mechanical Splices
Number of Bars X Proper C .... X Lapped Sptices X
Discrepancies/Comments: The following discrepancies were noted at the time of this observation.
1. Panels #67, #69, #72, #112 and #139 were missing comer bars in various areas.
Panels will require reobservation prior to concrete placement.
Field Results Report To:
Technician: 1~. P~ell gs[orfl'
Report Distribution:
(1) Transwestern Commercial Services
(1) Hill & Wilkinson, Ltd.
(1) O'Brien & Associates
(1) TechniStructures
(1) City of Coppell o Bldg. Insp.
30911w
(1) City of Coppe[I - Constr. Insp.
(1) State Farm insurance
(1) HBC Engineering
(2) Carter & Burgess
(1) Stap[es, Inc.
(1) Staples, Inc.
l['erracan
Eugene Harbour
Principal
This report is exclusively for the use of the client indicated above and shall not be reproduced withoul written approval of HBC/Terracon.