Loading...
Amberpoint BP 2-LR021230 (2)REPORT OF REINFORCING STEEL OBSERVATION 'll'erracan Consulting Engineers & Scientists 8901 Carpenter Fr~y., Suite ~tgO Dallas, Texas 75247 Date of Service: Client No.: Client: 12/30/02 3181 Transwestem Commercial Services 5001 Spring Val'ley Rd Ste 600W Dallas, TX 75244 Report No.: Project No.: Project: 94021380.0175 94021380 Staples 20 L Northpoint Coppell, TX Services: Drawings Utilized: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA S2.1 Locations/Items Observed: Panels #39 to #41, #67 to #74, #108 to #112 and #136 to #143 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Length and Shape Column Tie Spacing & Type Bar Size X Proper Placement Stirrup Spacing & Type X~ Bar Grade X Properly Tied Rebar Clean X Dowel Bars in Place X Welded Splices Form Clean X Proper Supports X Mechanical Splices Number of Bars X Proper C .... X Lapped Sptices X Discrepancies/Comments: The following discrepancies were noted at the time of this observation. 1. Panels #67, #69, #72, #112 and #139 were missing comer bars in various areas. Panels will require reobservation prior to concrete placement. Field Results Report To: Technician: 1~. P~ell gs[orfl' Report Distribution: (1) Transwestern Commercial Services (1) Hill & Wilkinson, Ltd. (1) O'Brien & Associates (1) TechniStructures (1) City of Coppell o Bldg. Insp. 30911w (1) City of Coppe[I - Constr. Insp. (1) State Farm insurance (1) HBC Engineering (2) Carter & Burgess (1) Stap[es, Inc. (1) Staples, Inc. l['erracan Eugene Harbour Principal This report is exclusively for the use of the client indicated above and shall not be reproduced withoul written approval of HBC/Terracon.