Loading...
Freeport NIP(2.7)-CS030129T H E C I T Y O F COPPELL X A 8 l 6 January 29, 2003 Thomas M. Stroh, P.E. Vice President Jones & Carter, Inc. 3030 LBJ Freeway, Suite 910 Dallas, TX 75234 RE: Product Support Services — Freeport North Dear Mr. Stroh: Marcie Diamond, Assistant Director of Planning, referred your January 23, 2003 letter to me for clarification and response. The maintenance of the drainage channel is the responsibility of the property owner in all aspects that are not considered to be `hard improvements'. Hard improvements would include channel improvements, structural repairs, slope paving, etc. Slope failure repair would still remain the owner's responsibility. Please share this information with the proposed owner, Product Support Services (PSS). If you have any further questions, please contact me. Sincerely, ,jw jkUKW Teresa Turner Graduate Engineer Office Phone: (972) 304 -3681 Fax: (972) 304 -3570 Cc: Marcie Diamond — Planning Department 255 PARKWAY * P.O. BOX 478 * COPPELL TX 75019 * TEL 9721462 0022 * FAX 972/304 3673