Loading...
MA FY 0102-LR021211Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 1 1 December 2002 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Cow Town Redi-Mix LOCATION OF POUR SET 1: Paving, Royal Lane, left southbound lane, approx. 260'-300' south of south curb of Northpoint Drive LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 901 Cement Ticket No. 008175 Flyash Time Batched 10:10am Sand Time Sampled 11:05am in. Concrete Temp. (ASTM C1064) 58°F 1.0 in. Air Content IASTM C231) 5.1% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 105 COIVIPRESSlVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM C143} psi Strength 1 5.50 5 12/16/02 2 5.50 7 12/18/02 3 5.50 14 12/25/02 4 5.50 14 12/25/02 5 5.50 28 01/08103 6 5.50 28 01/08/03 94,300 3340 107,300 3800 128,100 4530 122,600 4340 143,400 5070 147,100 5200 28-Day Average 5140 35OO TECHNICIAN: DISTRIBUTION: MFM (10:30am-12:30pm) (1) Pavement Services Corp. (1) City of Coppeil 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148