ST0301-CS030129 T H E · C I T Y - 0 F
COPPEi L
January29,2003
Ms. Tricia Hatley, P.E.
Freese and Nichols
1701 North Market Street
Suite 500 LB 51
Dallas, Texas 75202
Bethel Road II
ST 99-05
Requested Information
Dear Ms. Hatley:
As per your request, attached is the following information for you use in the design of the
above referenced project:
1. Southwest Coppell Storm Water Management Plan - HalffAssociates, Inc.
2. Sewerline Backfill on Bethel Road - Grapevine Creek to Near Royal Lane -
Patton, Burke & Thompson
3. Stamped Concrete Ordinance
4. Plat, drainage area map and utility plans - Old Coppeil Estates, The Reserve,
and the Summit at the Springs, Phase I
5. Digitial Orthophotograpy and GIS information (storm sewer structures do not
have GIS data such as such as size, structure type, etc. associated with them)
The study by Graham Associates was e-mailed to you today. The drainage study for
Bethel Road that is being prepared by TranSystems should be complete next week.
Should you have any questions or need any additional information, please contact me at
972-304-7019.
Sincerely,
Suzar( C.X~aylor
C.I.P. 'C'~rdinator
Attachments