Loading...
ST0301-CS030129 T H E · C I T Y - 0 F COPPEi L January29,2003 Ms. Tricia Hatley, P.E. Freese and Nichols 1701 North Market Street Suite 500 LB 51 Dallas, Texas 75202 Bethel Road II ST 99-05 Requested Information Dear Ms. Hatley: As per your request, attached is the following information for you use in the design of the above referenced project: 1. Southwest Coppell Storm Water Management Plan - HalffAssociates, Inc. 2. Sewerline Backfill on Bethel Road - Grapevine Creek to Near Royal Lane - Patton, Burke & Thompson 3. Stamped Concrete Ordinance 4. Plat, drainage area map and utility plans - Old Coppeil Estates, The Reserve, and the Summit at the Springs, Phase I 5. Digitial Orthophotograpy and GIS information (storm sewer structures do not have GIS data such as such as size, structure type, etc. associated with them) The study by Graham Associates was e-mailed to you today. The drainage study for Bethel Road that is being prepared by TranSystems should be complete next week. Should you have any questions or need any additional information, please contact me at 972-304-7019. Sincerely, Suzar( C.X~aylor C.I.P. 'C'~rdinator Attachments 255 PARKWAY lk P 0 BOX 478 * COPPELL TX 75019 ~ TEL 972/4§2 0022 1~ FAX 972/304 3673