Loading...
ST9602-CS030129T H E C 1 T Y O F ENGINEERING DEPARTMENT FAX COVER SHEET P.O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304 -3686 Fax: (972)304 -7041 To: V Q1Gk Log Aiy:S From: L l7lf�IPF�/4 Fax: a,14 (,� 5 3 b 44S Date l 1 1 °I 1 3 Phone: Pages 1 O (including cover sheet) Re: CC: ❑ Urgent ❑For Review ❑ Please Comment ❑ Please Reply ❑ As Requested *Comments: en IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304 -3686 "City ofCoppell Engineering - Excellence By Design" a North Central Texas Council Of Governments TO: Implementing Agencies FROM: Dan Rocha Principal Transportation Planner SUBJECT: Project Status Review Forms '21 Q- �S3 644c The North Central Texas Council of Governments ( NCTCOG) staff is continuing to monitor and refine projects contained in the Transportation Improvement Program (TIP), in order to develop the 2004 -2006 TIP project listing. An important part of this process is evaluating the status of projects currently programmed with Congestion Mitigation and Air Quality (CMAQ) Improvement Program and the Surface Transportation Program — Metropolitan Mobility (STP -MM) funding. To assist in this effort, we are asking that all implementing agencies complete and /or update the project information requested in the enclosed project status review form(s). Completed project status review forms should be returned to NCTCOG no later than Friday, January 31, 2003. Accurate information on advanced project development, right -of -way acquisition, and construction status will permit us to better track projects, to avoid schedule delays, and to ensure that we meet state air quality and letting requirements to prevent the loss of federal funds to the Dallas -Fort Worth region. Staff will use the information provided by each agency to allocate federal funding for all active projects to the appropriate years. The year in which funds are programmed will be determined based on average completion times for remaining phases of the project, financial constraint requirements, and the need to implement State Implementation Plan (SIP) commitments in a timely manner. All information submitted on these forms will be reviewed and appropriate updates to the TIP will be processed. Although we realize that not all questions will apply to every project, NCTCOG staff requests that you complete all applicable information. Instructions for completing the project status review forms are included on the back of each form. Please mail them to: Christie Jestis, Transportation Planner, North Central Texas Council of Governments, P.O. Box 5888, Arlington, Texas 76005 -5888. Should you have any questions or comments, plase contact Christie Jestis or me at 817/695 -9240. Thank you for your assistance. _ I Dan CMJ:baw Enclosure(s) cc: 2002 -2003 UPWP Element 3.01 Project File DATE: January 13, 2003 616 Six Flags Drive, Centerpoint Two P. O. Box 5888, Arlington, Texas 76005 -5888 (817) 640 -3300 FAX: 817-640-7806 ® recycled paper http://www.dfwinfo.com NC COG PROJECT STATUS .EVIEW 2 Total Project Cost % (includes PE, ROW, Construction) Total Federal $24,000 80°/ N State $0 0°/ D Local $6,000 1 20°/ 1 Total $30,000 100 N Obligated $6,000 Federal Funds Programmed By Year FY 2002 $18,000 FY 2005 $0 FY 2003 $0 FY 2006 $0 FY 2004 $0 FY 2007 $0 Funding Category JCMAQ 31 ADVANCED PROJECT DEVELOPMENT AJ RIGHT -OF- WAY /UTILITY ADJUSTMENTS Has agreement (LPAFA) with Is ROW acquisition needed for TxDOT been signed? (Y /N) this project? (Y /N) Date of agreement (LPAFA). (mm /dd /yy) What agency is responsible for ROW acquisition? Who is your contact person at TXDOT for this project? What is the total number of parcels that need to be acquired? Has project been cleared environmentally? (Y /N) What number has been acquired to date? What was the date of environmental clearance? (mm /dd /yy) What is the date of Final ROW acquisition ?* (mm /dd /yy) What percent of PS /E is currently complete? Have plans been sent to utility What is date or expected date of company(ies)? (Y /N) TXDOT review of final PS /E? (mm /dd /yy) Are utility adjustments needed? (Y /N) What date were utility adjustments completed?* (mm /dd /yy) 51 CONSTRUCTION Estimated Contract Let Date (mm /yy) • If date has not occurred, please estimate the Estimated Completion Date (mm /yy) expected date this item will take place. g Please indicate below if there is any more information about the project that has not been addressed above: Printed 1/13/03 Report completed by: Name Phone E -Mail NC ,oOG PROJECT STATUS EVIEW 2 F N D N Total (includes PE, Federal State Local Total Obligated Has agreement (LPAFA) with TxDOT been signed? (Y /N) Date of agreement (LPAFA). (mm /dd /yy) Who is your contact person at TXDOT for this project? Has project been cleared environmentally? (Y /N) What was the date of environmental clearance? (mm /dd /yy) What percent of PS /E is currently complete? What is date or expected date of TXDOT review of final PS /E? (mm /dd /yy) Is ROW acquisition needed for this project? (Y /N) What agency is responsible for ROW acquisition? What is the total number of parcels that need to be acquired? What number has been acquired to date? What is the date of Final ROW acquisition ?" (mm /dd /yy) Have plans been sent to utility company(ies)? (Y /N) Are utility adjustments needed? (YIN) What date were utility adjustments completed ?' (mm /dd /yy) Total Federal Funds Programmed By Year FY 2002 $0 FY 2005 $0 FY 2003 $0 FY 2006 $0 FY 2004 $64,000 FY 2007 $0 Funding Category CMAQ 31 ADVANCED PROJECT DEVELOPMENT 41 RIGHT -OF- WAY /UTILITY ADJUSTMENTS Has agreement (LPAFA) with TxDOT been signed? (Y /N) Date of agreement (LPAFA). (mm /dd /yy) Who is your contact person at TXDOT for this project? Has project been cleared environmentally? (Y /N) What was the date of environmental clearance? (mm /dd /yy) What percent of PS /E is currently complete? What is date or expected date of TXDOT review of final PS /E? (mm /dd /yy) Is ROW acquisition needed for this project? (Y /N) What agency is responsible for ROW acquisition? What is the total number of parcels that need to be acquired? What number has been acquired to date? What is the date of Final ROW acquisition ?" (mm /dd /yy) Have plans been sent to utility company(ies)? (Y /N) Are utility adjustments needed? (YIN) What date were utility adjustments completed ?' (mm /dd /yy) 51 CONSTRUCTION Estimated Contract Let Date (mm /yy) Estimated Completion Date (mm /yy) If date has not occurred, please expected date this item will take estimate the place. [6]Please indicate below if there is any more information about the project that has not been addressed above: Printed 1/13/03 Report completed by: Name Phone E -Mail NC :OG PROJECT STATUS .EVIEW 2 F N State D N Total (includes PE, Federal Local Total Obligated Project Cost ROW, Constructic $48,000 $0 $12,000 $0 FY 2004 Funding Category $ ADVANCED PROJECT DEVELOPMENT Has agreement (LPAFA) with TxDOT been signed? (Y /N) Date of agreement (LPAFA). (mm /dd /yy) Who is your contact person at TXDOT for this project? Has project been cleared environmentally? (Y /N) What was the date of environmental clearance? (mm /dd /yy) What percent of PS /E is currently complete? What is date or expected date of TXDOT review of final PS /E? (mm /dd /yy) 5 CONSTRUCTION Estimated Contract Let Date (mm /yy) Estimated Completion Date (mm /yy) $0 FY 2006 $0 $0 FY 2007 $0 :MAQ 1 RIGHT-OF-WAY/UT Is ROW acquisition needed for this project? (Y /N) What agency is responsible for ROW acquisition? What is the total number of parcels that need to be acquired? What number has been acquired to date? What is the date of Final ROW acquisition ?* (mm /dd /yy) Have plans been sent to utility company(ies)? (Y /N) Are utility adjustments needed? (Y /N) What date were utility adjustments completed ?* (mm /dd /yy) * If date has not occurred, please estimate the expected date this item will take place. g Please indicate below if there is any more information about the project that has not been addressed above: Printed 1/13/03 Total Federal Funds Programmed By Year FY 2002 $0 FY 2005 $48,000 20 %1 FY 2003 I $60,000 Report completed by: Name Phone E -Mail NC BOG PROJECT STATUS .EVIEW 2 F N State Total (includes PE, Federal Project Cost ROW, Construction) % Total Federal Funds Programmed By Year FY 2002 $0 FY 2005 $0 $0 #Error $0 #Error $0 #Error D Local FY 2003 $0 FY 2006 $0 1 Total FY 2004 $0 FY 2007 $0 $0 #Error N Obligated Funding Category ICMAQ $0 What is the date of Final ROW acquisition ?* (mm /dd /yy) 31 ADVANCED PROJECT DEVELOPMENT 41 RIGHT -OF- WAY /UTILITY ADJUSTMENTS Has agreement (LPAFA) with Is ROW acquisition needed for TxDOT been signed? (Y /N) this project? (Y /N) Date of agreement (LPAFA). (mm /dd /yy) What agency is responsible for ROW acquisition? Who is your contact person at TXDOT for this project? What is the total number of parcels that need to be acquired? Has project been cleared environmentally? (Y /N) What number has been acquired to date? What was the date of environmental clearance? (mm /dd /yy) What is the date of Final ROW acquisition ?* (mm /dd /yy) What percent of PS /E is currently complete? Have plans been sent to utility What is date or expected date of company(ies)? (Y /N) TXDOT review of final PS /E? (mm /dd /yy) Are utility adjustments needed? (Y /N) What date were utility adjustments completed ?* (mm /dd /yy) 51 CONSTRUCTION Estimated Contract Let Date (mm /yy) * If date has not occurred, please estimate the Estimated Completion Date (mm /yy) expected date this item will take place. g Please indicate below if there is any more information about the project that has not been addressed above: Printed 1/13/03 Report completed by: Name Phone E -Mail 2 Total Project Cost % $0 (includes PE, ROW, Construction) Total F Federal $72,000 80 CMAQ N State $0 0 / D Local $18,000 20 1 Total $6 000 100 N I Obligated $20,000 Federal Funds Programmed By Year FY 2002 FY 2003 FY 2004 $52,000 FY 2005 FY 2006 FY 2007 $0 $0 $0 $0 $0 Funding Category CMAQ 31 ADVANCED PROJECT DEVELOPMENT Has agreement (LPAFA) with TxDOT been signed? (Y /N) Date of agreement (LPAFA). (mm /dd /yy) Who is your contact person at TXDOT for this project? Has project been cleared environmentally? (Y /N) What was the date of environmental clearance? (mm /dd /yy) What percent of PS /E is currently complete? What is date or expected date of TXDOT review of final PS /E? (mm /dd /yy) Estimated Contract Let Date (mm /yy) Estimated Completion Date (mm /yy) 9 1 RIGHT-OF-WAY/UTILIT Is ROW acquisition needed for this project? (Y /N) What agency is responsible for ROW acquisition? What is the total number of parcels that need to be acquired? What number has been acquired to date? What is the date of Final ROW acquisition ?* (mm /dd /yy) Have plans been sent to utility company(ies)? (Y /N) Are utility adjustments needed? (Y /N) What date were utility adjustments completed ?* (mm /dd /yy) * If date has not occurred, please estimate the expected date this item will take place. 6 I Please indicate below if there is any more information about the project that has not been addressed above: Printed 1/13/03 Report completed by: Name Phone E -Mail INC�0OG PROJECT STATUS .EVIEWI NC O*OG PROJECT STATUS 7EVIEW 2 Total Project Cost % F (includes PE, ROW, Construction) Total Federal $0 1 #Error Federal Funds Programmed By Year N State $0 #Error FY 2002 $0 FY 2005 F $0 D Local Has agreement (LPAFA) with $0 I#Errorl FY 2003 $0 FY 2006 1 $0 1 Total $0 #Error FY 2004 Has project been cleared environmentally? (Y /N) $0 FY 2007 $0 N Obligated $o Funding Category complete? ICMAQ Have plans been sent to utility 31 ADVANCED PROJECT DEVELOPMENT AJ RIGHT -OF- WAY /UTILITY ADJUSTMENTS Has agreement (LPAFA) with Is ROW acquisition needed for TxDOT been signed? (Y /N) this project? (Y /N) Date of agreement (LPAFA). (mm /dd /yy) What agency is responsible for ROW acquisition? Who is your contact person at TXDOT for this project? What is the total number of parcels that need to be acquired? Has project been cleared environmentally? (Y /N) What number has been acquired to date? What was the date of environmental clearance? (mm /dd /yy) What is the date of Final ROW acquisition ?* (mm /dd /yy) What percent of PS /E is currently complete? Have plans been sent to utility What is date or expected date of company(ies)? (Y /N) TXDOT review of final PS /E? (mm /dd /yy) Are utility adjustments needed? (Y /N) What date were utility adjustments completed ?* (mm /dd /yy) 51 CONSTRUCTION Estimated Contract Let Date (mm/yy) * If date has not occurred, please estimate the Estimated Completion Date (mm /yy) expected date this item will take place. g Please indicate below if there is any more information about the project that has not been addressed above: Printed 1/13/03 Report completed by: Name Phone E -Mail NCCOG PROJECT STATUS .EVIEW 2 F N State D N Total (includes PE, Federal Local Total Obligated Project Cost ROW, Construction) % Total Federal Funds Programmed By Year FY 2002 $0 FY 2005 $0 FY 2003 $0 FY 2006 $0 FY 2004 $0 FY 2007 $0 Funding Category CMAQ $0 #Error $0 #Error $0 #Error $0 #Error $0 31--ADVANCED PROJECT DEVELOPMENT 41 RIGHT -OF- WAY /UTILITY ADJUSTMENTS Has agreement (LPAFA) with TxDOT been signed? (Y /N) Date of agreement (LPAFA). (mm /dd /yy) Who is your contact person at TXDOT for this project? Has project been cleared environmentally? (Y /N) What was the date of environmental clearance? (mm /dd /yy) What percent of PS /E is currently complete? What is date or expected date of TXDOT review of final PS /E? (mm /dd /yy) Is ROW acquisition needed for this project? (Y /N) What agency is responsible for ROW acquisition? What is the total number of parcels that need to be acquired? What number has been acquired to date? What is the date of Final ROW acquisition ?" (mm /dd /yy) Have plans been sent to utility company(ies)? (YIN) Are utility adjustments needed? (Y /N) 51 CONSTRUCTION What date were utility Estimated Contract Let Date adjustments completed?* ` (mm /yy) (mm/dd/yy) Estimated Completion Date (mm /yy) ' If date has not occurred, please estimate the expected date this item will take place. g IPlease indicate below if there is anymore information about the project that has not been addressed above: Printed 1/13/03 Report completed by: Name Phone E -Mail NC PROJECT STATUS .EVIEW 2 Total Project Cost % F (includes PE, ROW, Construction) Total Federal $0 #Error Federal Funds Programmed By Year N State $0 #Error FY 2002 $0 FY 2005 F $0 D Local Has agreement (LPAFA) with $0 *Error FY 2003 $0 FY 2006 $0 What agency is responsible for ROW acquisition? Total $0 #Error FY 2004 Has project been cleared environmentally? (Y /N) $0 FY 2007 $0 N Obligated $0 Funding Category Have plans been sent to utility JCMAQ 31 ADVANCED PROJECT DEVELOPMENT 4 RIGHT -OF- WAY /UTILITY ADJUSTMENTS Has agreement (LPAFA) with Is ROW acquisition needed for TxDOT been signed? (Y /N) this project? (Y /N) Date of agreement (LPAFA). (mm /dd /yy) What agency is responsible for ROW acquisition? Who is your contact person at TXDOT for this project? What is the total number of parcels that need to be acquired? Has project been cleared environmentally? (Y /N) What number has been acquired to date? What was the date of environmental clearance? (mm /dd /yy) What is the date of Final ROW acquisition ?* (mm /dd /yy) What percent of PS /E is currently complete? Have plans been sent to utility What is date or expected date of company(ies)? (Y /N) TXDOT review of final PS /E? (mm /dd /yy) Are utility adjustments needed? (Y /N) What date were utility adjustments completed ?* (mm /dd /yy) 51 CONSTRUCTION Estimated Contract Let Date (mm /yy) * If date has not occurred, please estimate the Estimated Completion Date (mm /yy) expected date this item will take place. [6 ] Please indicate below if there is anymore information about the project that has not been addressed above: Printed 1/13/03 Report completed by: Name Phone E -Mail