Loading...
PA9702-LR 990908 (2) CONCRETE COMPRi IVE STRENGTH 8901 Carpenter Frwy., Sldte #100 Dallas, T~xu 75247 Date of Service: 08/06/1999 Report No.: 9921340 Report Date 09/08/1999 Client No.: COPPELL ProjectNo.: 94991118 Client: CityofCoppell Project: CoppellAquatic/RecreationCtr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samp~es ~f fresh c~ncrete at the p~acement ~~cati~ns~ perfonn required ~e~d test and east compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: Nelson Brothers Concrete PLACEMENT DATE: 08/06/1999 BATCH TIME: 5:34am PLANT: 1 TIME SAMPLED: 6:08am BY: Roy Montgomery SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 80 F CONCRETE: 86 F SLUMP: 3-5" TRUCK NO: 220 TICKET NO: 76194 AIR: N/A AIRCONTENT(%): N/A UNIT WEIGHT (pcO: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Sidewalks at interior islands, south parking area ASTM C- 172 ASTM C-39 SAMPLE LOCATION: South interior island REPORT OF TESTS ACCUMULATivE VAnOS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE I I 5.50 08/13/1999 7 123050 4350 1 2 5.50 08/13/1999 7 126090 4460 Average 4410 1 3 5.50 09/03/1999 28 157740 5580 I 4 5.50 09/03/1999 28 160000 5660 Average 5620 Technician: Roy Montgomery Started: 5:30am Finished: 8:30am ~ En Ineerlng, Inc. ( I ) BrinkIcy Sargent Architects (I) CiW ofCoppell - Bldg. Insp. Eugene Harbour ( I ) Turner Engineers ( I ) City of Coppell - Leisure Se~ Dept Vice President (1) Hisaw & Associates This re~ is exclusively Cot the use of the client indicated above and shall not be reproduced except in full without the ~en app~vat of HBC Enginee6ng, Inc. 01EL Page I of 1 · r i T !