Loading...
Freeport NIP(7.0)-CS030130DUI'd~ I(~AL'I'][ (JUK~'UKAWJ. UI~ ~.l January 30, 2003 Project No. 8345 De.kc Construction Services Limimd Paizue~ship 5495 Belt Line Road, ~ulte 360 Dallas, Tetras 75240 ATTN' Mr. left 'I..augsion, P.E- Re: Gcou:chnic',d Design Panu-nacrs Proposed Detention Pond Thc Container Store Coppell, Texas Gentlemen: Subrmlled here arc design rccommendauons for {he proposcd detention pond at the referenced project. It is understood [he pond will located on [he northeast end of the site. Based on borings drilled in the area of thc proposed detention pond. subsurface conditions are anticipated va consist of 14 feet of dark gray to brownish-yellow, highly plastic clay over brownish-yellow sand. No ground water was encountered at the lime of the field investigation. However, the depth to and amount of ground water will fluc~ate with variations in seasonal and ye~'ly rah:flail. Existing grade in the area of the dc~eution pond ~s at approxuna~e Elcv. $17.0. The proposed d~pth of the bonom of[he deIenrion pond is Elev_ 498.0 Based on this information, the bottom of the excavation for the detention pond is anticipated to be within the alluvial sands. Thc excavation for the dezemion pond should allow for a minimum three-foot uhick clay hner_ Thc clay should be a CL or CH m~mrial with a minimum Plasacity Index {PI) of 25. Thc liner should bc placed in maximum eio~t-mch loose hfts and compacted to a minimum of 92 pcrcmat and a maxtmam of 98 percent of the maxunum density, as demrmined by ASTM 12-698. "Standard Proctor". The moisture content should range from ~- 1 to +5 percentage pom~s -above optimum We Irust this informauou will be sufficient for your needs, ifa.ny questions arise, do nor hesitate to call_ Sincerely, , LTD. t Ronald F~ Reed, P.E. DGW/R. FR/meb copies submincd: (2)