Loading...
Carter Phase 2-CS030206T H E C I T Y O F COPPELL P.O Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3681 ~ ~ ~) ~ ~' ~ Fax: (972)304-3570 T - "'~ o e x n s , a a ENGINEERING DEPARTMENT FAX COVER SHEET To: Robbie Nettles - C&N Fire Systems, Inc. From: Teresa Turner Fax: 817-926-8986 Date: 216/03 Phone: Pages: 6 (including cover sheet) Re: Development Fees CC: ^ Urgent ^For Review ^ Please Comment ^ Please Reply ^ As Requested Robbie: I have attached the Development Fee Tables for various sizes of domestic and irrigation meters. The types and sizes are indicated at the top of the sheet . If you choose to re-tap the main and increase the size of the domestic service line to accommodate the sprinkler system, the fees involved would be the difference between what was paid for with the 5/8" meter and what you would be assessed for the larger size (excluding tap and inspection fees, those would be assessed at the full amount). If you choose to do a separate tap, you will be assessed as shown in the fee table. You will need to work with the utilities department in determining the type of meter you need. Their number is 972- 462-5155. Once you determine which approach you are taking, contact me and I will send you a formal assessment. If you have any questions, please contact me at 972-304-3681. IF YOUDO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 "City of Coppell Engineering-Excellence By Design" DEVELOPMENT FEE TABLE Project: 5/8"Domestic Date: 1/0/00 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $280.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $24.77 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $280.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 '(100% due prior to Council Approval) Street Light Fee Information not Availa ble (100% due prior to Acceptance of Project) Street Sign Fee Information not Availa ble (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Availa ble (100% due prior to Start of Construction) TOTAL $764.77 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 DEVELOPMENT FEE TABLE Project: 1 ~' Domestic Date: lioioo TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $700.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $62.25 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $700.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 '(100% due prior to Council Approval) Street Light Fee Information not Availa ble (100% due prior to Acceptance of Project) Street Sign Fee Information not Availa ble (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Availa ble (100% due prior to Start of Construction) TOTAL $1,642.25 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 DEVELOPMENT FEE TABLE Project: 11/2" Domestic Date: I/0/00 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $1,400.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $142.10 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,400.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 '(100% due prior to Council Approval) Street Light Fee Information not Availa ble (100% due prior to Acceptance of Project) Street Sign Fee Information not Availa ble (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $3,122.10 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 DEVELOPMENT FEE TABLE Project: 11/2"Irrigation Date: 1/0/00 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $1,400.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $142.10 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 '(100% due prior to Council Approval) Street Light Fee Information not Availa ble (100% due prior to Acceptance of Project) Street Sign Fee Information not Availa ble (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $1,622.10 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 DEVELOPMENT FEE TABLE Project: 2"Irrigation Date: 1/0/00 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $2,240.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $205.28 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) IrrigationlFireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 '(100% due prior to Council Approval) Street Light Fee Information not Availa ble (100% due prior to Acceptance of Project) Street Sign Fee Information not Availa ble (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Availa ble (100% due prior to Start of Construction) TOTAL $2,525.28 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 ~~ ._ _n . ~~ ~ ~~ _ --~ rt =-~a k -_.--~n. a _~~~. ~ a. ~ Teresa Turner Re Fees Page 1 i' . A - ~ ~ e. ~ Cam` ~ ~~ i From: Debbie Ingram To: Teresa Turner Date: 2/6/03 1:07:30 PM Subject: Re: Fees We won't give them the money back, but we can give them credit toward the new one. I asked Ted about it. So if you want, you can just note this on the assessment. This way we will all be clear on it. »> Teresa Turner 02!06!03 12:58PM »> Debi -this is about that fire sprinkler issue (sigh)..... If they wanted to replace the existing 5/8" domestic meter with a larger one, would they get the meter fee back ($24.77) when they returned the 5/8" meter to you? ~~1 ~~~ ~S`~ ~~ ~~ - , \`~ ~~ ~~~ ~~ . a~~ ~ ~n ~~~~-` ~~ ~~ ~~