Loading...
ST0102-CS030109January 9, 2003 PK No.: 2052-02.048 Mr. Ken Griffin, P.E. CITY OF COPPELL 255 Parkway Blvd. Coppell, Texas 75019 Re: RUBY ROAD Coppell, TX Dear Ms. Griffin: As per our conversation, Duke Realty has requested the installation of the proposed drive approaches off of Ruby Road be included as part of the roadway construction. Pacheco Koch has determined that the change in material for the drives would be as follows: West Drive East Drive Total Concrete Pavement 74 SY 59 SY 133 SY Subgrade 70 SY 56 SY 126 SY Concrete Curb (-35) FT (-26) FT (-61) FT Pacheco Koch has informed Duke Realty that the City wishes this additional work to be implemented as a Change Order, and that the City will not authorize the construction of the drives until the proposed Change Order be paid in full by Duke Realty. Duke has responded that they would have no issues as long as they can review costs provided by Tiseo prior to Duke's acceptance. Please note that a reproducible set of drawings reflecting these changes are included as part of this submittal. If you have any questions regarding the enclosed items or need any additional information, please call me at your convenience. Sincerely, C. Jack Evans CJE/slt 2052-317