Loading...
Lakeside V1-CS 850314 (3)Date: 3-14-85 Rev. No: 0 DEVELOPMENT IMPACT ANALYSIS Lakeside Village A. General 1. Development Name and size: Lakeside Village, 11.0 c acres 2. Owner: NWC/Sandy Lake-MacArthur Joint Venture 3. Engineer: Lawrence A. Cates & Associates 4. Current zoning: Commercial 5. Current status of development: Preliminary Plat 6. Location: Northwest corner, Sandy Lake Rd. and MacArthur Blvd. 7. Proposed density: N/A 8. Annexation or land study required: N/A 9. Issues resolved: None 10. Issues to be resolved: Drainage and dedications 11. Dedications required: Sandy Lake Road and right turn lanes Sidewalk easement at MacArthur B. C. Impact 1. Traffic: a. Off-site collector streets: None b. Off-site arterial streets: Sandy Lake Road, MacArthur Blvd. 2. Sewer: a. Proposed mains: 8" on-site b. Proposed connections to exi sting mains: At MacArthur 3. Water: 8" main, connect to 16" main at Sandy Lake Road 4. Drainage or Flow: To Lakes of Coppell 5. Schools: a. Primary school: N/A b. Middle school: N/A Approvals and Fees 1. Fees: item _. Preliminary Plat Final Plat Construction Permi Water Availability Sewer Availability Parks Fees Required (when required) Paid to dat $ 104.00 486.40 t Fee 11,316.00 Fee 11,036.00 Fee 11,036.00 N/A 2. Assessments and Pro Rata Charges: a. Item: Sandy Lake Road, $75/lf x 885' _ $66,375.00 Summary: b. Item: Summary: 3. Approvals a. Annexation b. Land study: P&Z, City Council _ c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: 3-15-85 Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer: Planning & Zoning: City Council _ f. Construction Plans: City Manager: _~_ City Engineer: ___._._ g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: __