Lakeside V1-CS 850314 (3)Date: 3-14-85
Rev. No: 0
DEVELOPMENT IMPACT ANALYSIS
Lakeside Village
A. General
1. Development Name and size: Lakeside Village, 11.0 c acres
2. Owner: NWC/Sandy Lake-MacArthur Joint Venture
3. Engineer: Lawrence A. Cates & Associates
4. Current zoning: Commercial
5. Current status of development: Preliminary Plat
6. Location: Northwest corner, Sandy Lake Rd. and MacArthur Blvd.
7. Proposed density: N/A
8. Annexation or land study required: N/A
9. Issues resolved: None
10. Issues to be resolved: Drainage and dedications
11. Dedications required: Sandy Lake Road and right turn lanes
Sidewalk easement at MacArthur
B.
C.
Impact
1. Traffic:
a. Off-site collector streets: None
b. Off-site arterial streets: Sandy Lake Road, MacArthur Blvd.
2. Sewer:
a. Proposed mains: 8" on-site
b. Proposed connections to exi sting mains: At MacArthur
3. Water: 8" main, connect to 16" main at Sandy Lake Road
4. Drainage or Flow: To Lakes of Coppell
5. Schools:
a. Primary school: N/A
b. Middle school: N/A
Approvals and Fees
1. Fees:
item _.
Preliminary Plat
Final Plat
Construction Permi
Water Availability
Sewer Availability
Parks
Fees Required
(when required) Paid to dat
$ 104.00
486.40
t Fee 11,316.00
Fee 11,036.00
Fee 11,036.00
N/A
2. Assessments and Pro Rata Charges:
a. Item: Sandy Lake Road, $75/lf x 885' _ $66,375.00
Summary:
b. Item:
Summary:
3. Approvals
a. Annexation
b. Land study: P&Z, City Council _
c. Zoning: P&Z, City Council
d. Preliminary Plat:
City Engineer: 3-15-85
Planning & Zoning:
City Council:
e. Final Plat
City Manager:
City Engineer:
Planning & Zoning:
City Council _
f. Construction Plans:
City Manager: _~_
City Engineer: ___._._
g. File approved plat:
h. Letter of acceptance:
i. Receive as-builts:
j. End of warranty period: __