Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Coppell Bible-LR030106 (2)
F:t EE'r-I I E I--I r-~ I f--lE EF~III'--II~ GEOTECHNICAL AND I~ I~ I~ LJ F~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLIN DER~'ST.~EPORT ~------~.n.n.n~_ll Bible Fellowship ~ 751 Sandy Lake Road Coppell, Texas REPORTED TO: EMJ Corporation 1303 Walnut Hill Lane, Suite 130 Irving, Texas 75038 ATTN: Mr. Tony Scorsone CONTRACTOR: EMJ Corporation Location of Sample REPORT NO. 25 REG PROJECT NO. 9674 SAMPLE DATE: 01-06-03 TECHNICIAN: H. Johnson Set Number I Location I Quantity Represented 1 Paving: 40'S, 20'E of S.W. building corner 30/390 2 Paving: 75'S, 60'E of S.W. building corner 60/390 3 Paving: 50'S, 110'E of S.W. building corner 110/390 4 Paving: 110'N, 20'E of N.W. building corner 160/390 5 Paving: 70'N, 50'E of N.W. building corner 230/390 6 Paving: 120'N, 80'E of NW. building corner 260~390 7 Paving: 40'N, 50'W of N.E. building corner 310/390 Design Information I Source of Concrete I Mix Identification TXI 8205 Specified Strength p.s.i. 40OO Test Results No. iD Date Tested Test Strength p.s.i. Strength p.s.i. 5691 01-13-03 7 120710 4270 5691 01-13-03 7 122380 4330 4300 5691 02-03-03 28 162030 5730 5691 02-03-03 28 170260 6030 5880 5691 Hold H 5692 01-13-03 7 95280 3370 5692 01-13-03 7 130050 4600 3990 5692 02-03-03 28 157260 5570 5692 02-03-03 28 162230 5740 5660 5692 Hold H 5693 01-13-03 7 112100 3970 5693 01-13-03 7 118310 4190 4080 5693 02-03-03 28 154610 5470 5693 02-03-03 26 156810 5550 5510 5693 Hold H 5694 01-13-03 7 114050 4040 5694 01-13-03 7 120070 4250 4150 5694 02-03-03 28 151910 5380 5694 02-03-03 28 155340 5500 5440 5694 Hold H Total Load lbs. 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 ' FAX [214] 350 0019 Set Cylinder I No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 7 86230 3050 7 91700 3250 3150 28 125130 4430 28 129360 4580 4510 H 5695 01-13-03 5695 01-13-03 5695 02-03-03 5695 02-03-03 5695 Hold 5696 01-13-03 7 140680 4980 5696 01-13-03 7 143590 5080 5030 5696 02-03-03 28 170370 6030 5696 02-03-03 28 181430 6420 6230 5696 Hold H 5697 01~13-03 7 112770 3990 5697 01-13-03 7 121150 4290 4140 5697 02-03-03 28 155850 5520 5697 02-03-03 28 158030 5590 5560 5697 Hold H Cylinder Data Set Cylinder I Timeof ConcreteI Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 5692 5.00 7:40AM 41 56 4.6 3264959 2 5692 5.00 8:50AM 41 54 4.6 3265002 3 5693 5.00 9:25AM 44 58 4.8 3265058 4 5694 5.50 9:40AM 44 53 4.4 3265129 5 5695 4.50 11:00AM 51 62 4.6 3265273 6 5696 5.00 11:30AM 54 61 4.8 3265337 7 5697 5.00 12:15PM 56 63 4.4 3265407 Mail Distribution: (1) EMJ Corporation/Mr. Tony Scorsone (1) City of Coppell/Mr. Garreth Campbell (1) Clark Electrical Construction/ Mr. David Patterson Submitted by: REED ENGINEERING GROUP, LTD. original Signed By Keith Atkins KEA/je