Loading...
Freeport NIP(7.0)-LR030212RoneEn g 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) REPORT OF WATER INJECTION INSPECTION Client: Duke Realty Services, LP Report No.: 170467 Atto: Mr. JeffLangston Project No.: 037333 . 5495~ Belt Line_Road, Suite 360 Date of Service: 02/10/2003 Dallas TX 75254 Report Date: 02/12/2003 Project: Freeport 10 500 Freeport Parkway Coppell, TX Water Injection Inspection Services: Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform a Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: David Wallace Report Distribution: (1) Duke Realty Services, LP (l) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers 6:30am - 5:00pm (1) Engineering Analyst K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99SW Pa~e I of I WATER INJECTION OBSERVATION Client: Project: Duke Realty Services, LP -Freeport 10 Coppell, Texas Report No.: Project No.: Date of Service: Page 2 of 3 170467 037333 2/10/03 DESCRIPTION/EXPLANATION YES NO NIA 1. Specific gravity of lime was checked and found to be 1.14 and 1.17 x 2. Lime slurry was continuously agitated x 3. Surfactant was added to each load x 4. The injection pressure was kept between 50 to 100 psi at point of injection x 5. Intervals of 12" were achieved during injection process until refusal x 6. Total depth of injection -- 10 feet x 7. Max. spacing of injection probes was recorded to be 5 ff. X 8. Free lime on surface x 9. Square feet injected on this date 104000 10. Location of injection Building Pad Remarks: Standby time 8:30am - 10:30am due to equipment being moved See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: Technician: 6:30am - 5:00pm David Wallace LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.