Gateway BP(1.4)-CS030211T H E C 1 T Y •O F
COPPELL
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
From: Larry Davis, Construction InspectorAa
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
Date:
RE:
February 11, 2003
WALK -THRU for Haverty's Drainage Improvements
and Exchange Circle Reconstruction
A final walk -thru for paving, sanitary sewer, water and storm drainage on the referenced
project has been scheduled for:
Thursday, February 20 at 9:00 a.m.
Please let me know if I can be of further assistance.
cc: Marty Paris, P.E., Halff Assoc.
John Burns Construction fax 972 221 -8301
Catellus Development Corp. fax 972 419 -1922
"CITY OF COPPELL ENGINEERING EXCELLENCE BY DESIGN"
To: e4 ELLG L
Fax 9.1 2._' L- 1
Phone:
•Comments:
T H E C 1 T Y O F
COPPELL
Ig22
ENGINEERING DEPARTMENT
FAX COVER SHEET
Re: WALK erect Fore /`S
From:
Date:
Lg2,e1 DA vt3
0 21/3103
P.O. Box 478
255 Parkway Blvd
Coppell, TX 75019
Phone: (972)304 -3679
Fax: (972)304-3570
Pages: 2 (including cover sheet)
CC:
Urgent ❑For Review Please Comment Please Reply As Requested
I Li SE P/ecc T 7//S F4,4' To 7-E
4PP2o PA, i E, RE i L/ FO
TIDE V/a27yS pko fo /7 i y
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304 -3679
"City of Coppell Engineering— Excellence By Design"