Loading...
PA9702-LR 990902CONCRETE COMPR- ,3IVE STRENGTH TESg_ ENGINEHI~I~, INC. 8901 Carpenter h'wy., Suite 0100 Dallas, Texas 7S247 Date of Service: 08/04/1999 Report No.: 9921085 Report Date 09/02/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra33Reid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. ~/96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: Nelson PLACEMENT DATE: 08/04/1999 BATCHTII~E: 3:52pm PLANT: Lewisville TI1VIESAMPLED: 4:40pro BY: Harvey Plunk SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Mild STRENGTH: 3000 psi @ 28 Days TEI~WERATURE (F) - AIR 82 F CONCRETE: 88 F SLUMP: 4-6" TRUCK NO: 218 TICKET NO: 76050 AIR: N/A AIR co~TE,~r (%): N/A UNIT WEIGHT (pc.l): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Entrance paving ASTM C-172 ASTM C-39 SAMPLE LOCATION: 40' W of east end of drive REPORT OF TESTS ACCUMULATIVE yARDS: iO CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (ibm. force) (psi) TYPE 1 I 5.00 08/11/1999 7 114550 4050 1 2 5.00 08/11/1999 7 132540 4690 Average 4370 I 3 5.00 09/01/1999 28 153860 5440 1 4 5.00 09/01 / 1999 28 154770 5470 Average 5460 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. [ CONCRETE COMPR t MVE STRENGTH TES_ F~4GINEEt~NG, INC, 8901 Carpeuter Frwy,, Suite #100 Dallas, Tex~s 75247 DateofService: 08/04/1999 Report No.: 9921085 Report Date 09/02/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compresslye strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc, CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: Nelson PLACEMENT DATE: 08/04/1999 BATCHT~IE: N/A PLANT: Lewisville TLMESAMPLED: 6:30am BY: Harvey Plunk SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Mild STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 86 F CONCRETE: 89 F SLtrMr: 4-6" TRUCK NO: 222 TICKET NO: 76058 AIR: N/A AreCONTENT(%): N/A UNITWEIGHT(per): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: t 60' W of E end of drive REPORT OF TESTS Acc~nvar~A~rw VAR~S: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLITMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi), TYPE 2 1 4.50 08/11/1999 7 112790 3990 2 2 4.50 08/11/1999 7 116470 4120 Average 4060 2 3 4.50 09/01/1999 28 141350 5000 2 4 4.50 09/01/1999 28 146900 5200 Average 5100 Technician: Harvey Plunk Started: 3:00pro Finished: 6:00pro ~ Eng/ Report Distribution: ' ' ( 1 ) City of Coppell ( I ) City of Coppe II - Engi neering ( I ) Brinkley Sargent Architects ( 1 ) City of Coppell - B lag. lnsp. Eugene Hatbout (I) Turner Engineers (1) City of Coppell - Leisure Serv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not he reproduced except in full without the written approval of HBC Engineering. Inc.