Loading...
ST9401-CS000420Date: To: From: COPPELL LEISURE SERVICES DEPARTMENT April 20, 2000 Mike Martin, Assistant City Engineer R.D. Slayton, Park Operations Superintendent Assesment of Denton Tap Medl~xs and Adjacent Properties Per your request Parks Staff has completed an assessment of the above referenced project and has created the following punch list items: lrrit, ation issues 1. Power has been severed to the 1s~ median North of the bridge which contains an irrigation controller. 2. Approximately (6) Tom 570 heads are missing and/or damaged. 3. The main line to a valve that was removed, needs to be capped. 4. Numerous heads arc out of adjustment spraying water into the street. 5. The median located at 121 & Denton Tap has a lateral line leak Landscape Issues 1. The entire scope of this project is in need ofgrass establishment When will the contractor return to hydromulch or sod the area? Please contact me at you earliest convenience with dates and times for completion of this project so that we may bring closure to this project. Thanks, RDS /ds cc: Gary Sims, Director of Leisure Services