Loading...
Trinity Shores-CS030220CO?iSELL February 20, 2003 Houshang Jahvani Jahvani Engineering Associates 2125 N Josey Lane, Suite 202-B Carrollton, TX 75006 RE: Trinity Shores Final Acceptance Dear Mr. Jahvani: The improvements in the above referenced project were inspected during construction by the City of Coppell Engineering Department and were installed according to plans and our specifications governing such work. As of this date, the facilities are accepted subject to the two-year maintenance agreement. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Thank you for your cooperation during this construction, and if I can be of further service, please contact me at (972) 304-3685. Garreth Campbell Construction Inspector Office Phone: (972) 304-3685 Fax: (972) 304-3570 CC: Ken Griffin, Director of Engineering & Public Works Rhonda Brothers, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Cramp, Fire Marshal Jennifer Armstrong, Finance Director · :. Matthew Marchant Hobart Development, Inc. 2125 N Josey Ln, Ste 200 Carrollton, TX 75006 255 PARKWAY ~t~ P O BOX 478 'h' COPPELL TX 75OI 9 ~r TEL 9?2/462 0022 ~ FAX 972/304 3673 **** . OLD REPUBLIC , ~ * Old Republic Surety Company · Old Republic Insurance Company · . · . Bituminous Casualty Cozl~oration KNOW ALL MEN BY THESE PRESENTS: That BOND NO.: BCN1048849 Cutes, Courtney &Roebuck, LLC as Principal, and Bituminous CasualWCorpomtion , a corporation organized under the laws of the State of ~l~inois and authorized to do a surety business in the State of Texas, with office at Rock Island~ Illinois , as Surety, are held and firmly bound unto Ci~ ofCoooell. Texas as Obligee in in the sum of Seventy-One Thousand, Thirty& 30/100. ($.71,030.30- ......... ), lawful money of the United States of America, for the payment of well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: SFJ%LED with our seals and dated this 4~] day of. November 2002 ' WHEREAS, on the Januaq7,2002 the said Pr as contractor, entered into a contract for THnityShores Estates Pavir~, with Hobart Development. Inc. for the sum of One Hundred Forty-Two Thousand, Sixty & 60/100 ($ 142,060.60. and, WHEREAS, under the terms of the specifications for said work, the said Principal is required to give a bond for Seventy-OneThousand, Thirty&30/100- ($ 71,030.30 .... to protect the Obli~ee against the result of faulty materials or workmanship for a period of bNO(2) year(s) from and after the date of the completion and acceptance of same. NOW THEREFORE, if the said Principal shall for a period of tWO~21 year(s) from and after the date of the completion and acceptance of same by the Obli~e. replace any and all defects arising in said work whether resulting from defective materials or defective workmanship, the above obligation to be void; otherwise to remain in full force and effect. Principal: ~T,~TI~ ~ ROEBUCK, LLC Sure.ty~/~BITUMINOUS CASUALTY CORPORATION Tamara E. Murray . ~J Attorney-in-Fac~- IMPORTANT NOTICE To obtain information or make a complaint: You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at: P.O. Box 149104 Austin, Texas 78714-9104 Fax # (512) 475-1771 PREMIUM OR CLAIM DISPUTES The address of the surety company making this bond to which any notice of claim should be sen~ may be obtained by calling the Texas Department of Insurance at the above number. Should you have a dispute concerning your premium or about a claim, you should contact the agent or the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. A~TACH THIS NOTICE TO YOUR BOND This notice is for information only and does not become a part or condition of the attached document. This notice is given to comply with Section 2253.048, Texas Government Code and Section 53.202, Texas Property Code effective September 1, 2001. . . OLD EPUBLIC Old R~=t~l. ie l'n~m~L-~n¢:~ ~y fl . * Bi'ctminou~ Ca~-~,!t-y Court.on KNOW ALL MEN BY THESE PRESENTS: That BOND NO.: BCN1048929 HobaK Development, Inc. as Principal, and B~uminoueCssua~Co~omfion , a corporation organized under the laws of the State of llJino~ and authorized to do a surety business in the State of Texas, with office at Rock Islandt Illinois , as Surety, are held and firmly bound unto C~y0fCo~oelI, Texss aa Obligee in in the sum of One Hundred Forb/-Six Thoumand, Seven Hundred Fift~-Six & 2~100 ($ 146~756.25 .), lawful money of the United States of America, for the payment of well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: SEALED with our seals and dated this 10th day o% Januaw 2003 ' WHEREAS, on the March 14, 2002 the said~ as contractor, entered into a contract for Trin~ Shores Estates Utilities w/th J & J Utile/Construction, Inc. for the sum of One Hundred Fody-Six Thousand, Seven Hundred Fifty-Six & 25/100 ($ 146,756.25 ); and, WHEREAS, under the terms of the specifications for said work, the said Pr~ncipal is required to give a bond for One Hundred Forty-Six Thousand, Seven Hundred Fifty-S~& 25/100 ($ 146,756.25 ), to protect the Obli~ee against the result of faulty materials or workmanship for a period of year(s) from and after the date of the completion and acceptance of same. NOW THEREFORE, if the said Principal shall for a period of ~NO(2) year(s] from and after the date of the completion and acceptance of same by the Obli~ee replace any and all defects arising in said work whether resulting from defective materials or defective workmanship, the above obligation to be void; otherwise to remain in full force and effect. Principa_l..: I'JOBART DEVELOP~MENT, IN~. / Keh/n~'E. Marchant, President / Surety~ BITUMINOUS CASUALTY CORPORATION Tama~ E. Murray Attorney-in-Fact IMPORTANT No'rICE To obtain information or make a complaint: You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Depa~'huent of Insurance at: P.O. Box 149104 Austin, Texas 78714-9104 Fax # (512) 475-1771 PREMIUM OR CLAIM DISPUTES The address of the surety company mnking this bond to which any notice of claim should be sent may be obtained by calling the Texas Department of Insurance at the above number. Should you have a dispute concernin~ your premium or about a claim, you should contact the agent or the company first. If the dispute is not resolved, you may contact the Texas Depaatment of Insurance. ATTACH THIS NOTICE TO YOUR BOND This notice is for information only and does not become a part or condition of the attached document. This notice is given to comply with Section 2253.048, Texas Government Code and Section 53.202, Texas Property Code effective September 1, 2001. FROI'I :-LT UT)LITY lINC F~ NO. :9~2 2~ 1224 liar. 14 2l~F2 12:l~Ptq P:3 Trinity Shom~ Exh~bi~ "A " Sanitary Sewer ITEM DESCRIPTION QUANTITY UNIT UNIT BIO TOTAL BID ss-1 8" stir.35 ~an.swr. 920 LF $14.00 $12,880.00 ss-2 4'services 19 EA ~300.00 ss-3 4'die.manhole 5 EA $1,500.00 $7.5~0.00 ss-4 density, ak, tv, testing 920 LF Sl.00 $920.00 ss-5 trench safely 920 LF $1.00 $920.~0 Water $27,920.00 ITEM DESCRIPTION QUANTITY UNIT UNIT BID TOTAL BID w-1 1Z' DR-18 340 LF $19.75 w-2 8'DR-18 780 LF $15.25 $11,895.00 w-3 12"valve 1 EA $1,250.00 $1,250.00 w.4 8" valve 2 EA $850.00 $1,70000 w-5 fire hydrenl 3 EA $1,550.00 $4,650.00 w-6 1" service 19 EA $345.00 S6.555.00 w-7 cast iron ~tings 0.5 Ins $1,900.00 S950.00 w-8 tie to existing I EA $1.00 $1.00 S34,216,00 Storm Sewer ITEM DESCRIPTION QUANTITY UNIT UNIT BID TOTAL BID sd-1 21" Rcp 898 LF S35.25 $3t,654.50 Sd-2 30"Rcp 117 LF S38.75 $4,533.75 Sd-3 36" Rcp 213 LF $64.00 $13.632.00 $d-4 4' wye inlet 2 EA $2,500.00 $5,000.00 sd-5 3 grate inlet 3 EA $3,250.00 $9,750.00 scl-7 36" Type 8 Ileaclwell 1 EA $2,75000 $2,750.00 sd-8 Junction Box 2 EA S3,8.50.00 $7,700.00 sd-9 wye fittings 3 EA $500.00 $1,500.00 Sd-10 18' pier 1 EA $80,020.25 TOTAL BID $142,1.(,~.25 ·em Deacriptio. II, ms of Work · o~ ~xcav. & FII On ~em~ Lime Stabllizab'On 2 Year lO0~41ainle.anca Bond Total AmOunt of Bid 195 t $6.90 $106.0~