Loading...
PA9702-LR 9908312ONCRETE COMPRE . VE STRENGTH TESY''N 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 )ate of Service: 08/02/1999 Report No.: 9920846 Report Date 08/31/1999 Client No.: COPPELL Project No.: 94991118 C|ient: CityofCo II Project: CoppellAquatic~RecreationCtr 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 08/02/1999 .ATC. T~ME: 8:04am PLANT: N/A TIME SAMPLED: 8:30am .¥: Harvey Plunk SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, hot STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 86 F CONCRETE: 89 F SLUMP: 4-5" TRUCK NO: 211 TICKET NO: 75963 AIR: N/A AIR CONTENT (%): N/A U~T WEICtrr (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Swimming pool floor ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS Acctr~ra~nvEvAaos: I0 CYLINDER MEASURED MAXIMUM COM~RESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.00 08/09/1999 7 127430 4510 I 2 6.00 08/09/1999 7 130600 4620 Average 4570 I 3 6.00 08/30/1999 28 141550 5010 I 4 6.00 08/30/1999 28 146150 5170 Average 5090 Sample location: Footings on south swj_mming pool on southweslc corner of pool Technician: Harvey Plunk Started: 5:15am Finished: 9:00am ~~.~ertng, Inc. Report Distribution: (1) City of Coppell (I) City of Coppell - Engineering gene Harbour (1) BrinkIcy Sargent Architects (1) City of Coppell - Bldg. lnsp. (1) Turner Engineers (I) City of Coppeli - Leisure Serv Dept Vice President (|) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.