Creekview P2 L1R BA-LR030110ALPHA TESTING, INC.
2209 WL~con~n St,, Su#e 100
Dallas, Texas 7522~
972/620-891 ! - 972/263-4937 (Metro)
FAX: 972/406-8023
DAILY FIELD REPORT
TESTED FOR: TRI-STAR CONSTRUCTION
LEWISVILLE, TEXAS
PROJECT:
SALON ON THE CREEK
COPPELL, TEXAS
DATE: 01/10/03
OUR REPORT NO:
02741-29
TECHNICIAN: J.U,
WEATHER: CLEAR TEMPERATURE RANGE:
'HE ALPHA TECHNICIAN TRAVELED TO THE SITE TO DELIVER 3 SETS OF 4 CYLINDER MOLDS AND TO OBTAIN
SET OF 4 CLIENT MADE CYLINDERS.
'ER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATION:
PAVING ON DENTON DRIVE APPROACH AND PUBLIC SIDEWALK ALONG BETHEL RD.
FHE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING. LABORATORY COMPRESSION
TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT.
AT THE COMPLETION OF THE SCHEDULED PICKUP, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.
CC:
CD CONSULTING
TRI-STAR CONSTRUCTION
CITY OF COPPELL
Respe,
Geotechnical Engineering 0 Construction Materials Testing 0 Environmental Engineering 0 Consulting