Creekview P2 L1R BA-LR021120ALPHA TESTING, INC.
2209 Wisconsin St,, Suite I00
Dallos, Texas 75229
972/620-8911 - 972/263-4937 (Metro)
FAX: 972/406-8023
DAILY FIELD REPORT
TESTED FOR: TRI-STAR CONSTRUCTION
LEWISVILLE, TEXAS
DATE: 11~0~2
PROJECT: SALON ON THE CREEK OUR REPORT NO: 02741-15
COPPELL, TEXAS
TECHNICIAN: J.U,
WEATHER:
TEMPERATURE RANGE:
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT, AS REQUESTED, TO OBTAIN 5
;ETS OF 4 CLIENT MADE CYLINDERS.
'ER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATIONS: SET 1 - SLAB, 5' N & 20' W FROM MOST SOUTH OF SE CORNER OF BUILDING
SET 2 - SLAB, 5' S & 40' W FROM NE CORNER OF BUILDING
SET 3 - PAVING, 25' S & 25' E FROM NW CORNER OF WEST PARKING LOT
SET 4 - PAVING, 25' N & 25' E FROM SW CORNER OF SOUTH PARKING LOT
SET 5 - PAVING, 25'N & 25' W FROM SE CORNER OF SOUTH PARKING LOT
THE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING. LABORATORY COMPRESSION
TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT.
~,T THE COMPLETION OF THE SCHEDULED PICKUP, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.
;C:
CD CONSULTING
TRI-STAR CONSTRUCTION
:ITY OF COPPELL
Our test results and repods are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except w~th express approval of
Geotechnical Engineering 0 Construction Materials Testing 0 Environmental Engineering 0 Consulting
ALPHA TESTING, INC.
2209 Wisconsin St., Suite 10
Dallas, Texas 75229
(972) 620-8911
Tested For: TRIoSTAR CONSTRUCTION
ATTN: MR. FRED DONALDSON
220 ELM STREET, SUITE 100
LEWISVILLE, TX 75057
Fax Number: (972) 219-7099
Project Desc: SALON ON THE CREEK
684 SOUTH DENTON TAP ROAD
Concrete Compression Test
Report
Our Report No.: 02741-9
Issue Date: 11/20/2002
FIELD DA TA
Placement Location: PIERS; B-2, D-2, E-2, F-2, H-2, I-2
Data Placed: 10/15/02
Time Placed: N/A
Slump (ASTM C-143): N/A
Air Content: N/A
Air Temperature: N/A
Specimen Temperature:. N/A
Date Received: N/A
Delivery Method: PICKED UP BY ALPHA
Field Data Submitted By:
Mix Data Submitted By: N/A
Plant Number: N/A
Delivery Ticket No.: NIA
Made By:
Cured Specification: ASTM C-31
CYLINDER COMPRESSION TEST RESULTS
Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max
No.: Type: Spec: Tested: (Day~): Length Width Diameter Sq. In. Load: PSI:
5 LAB C-1231 10/22/02 7 12 N/A 6 28.27 57380 2020
6 LAB C-1231 11/12/02 28 12 N/A 6 28.27 121470 4290
7 LAB C-1231 11/12/02 28 12 N/A 6 28.27 119760 4230
8 LAB HOLD HOLD 12 N/A 6 28.27 0
Specifications: 28 3000
PASS
Results to Date:
Notes: CLIENT MADE CYLINDERS.
CC: CD CONSTRUCTION CONSULTING, TRI-STAR CONSTRUCTION, CITY OF COPPELL
Our test results and reports are for the exclusive us~of.~'~lient (and their designated recepients on file in our office)and shall not be reproduced and/or distributed
except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples
tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.