Loading...
Creekview P2 L1R BA-LR021104ALPHA TESTING, INC. 2209 Wisconsin St., Suite 10 Dallas, Texas 75229 (972) 620-8911 Concrete Compression Test Report Tested For: TRI-STAR CONSTRUCTION A~-i'N: MR. FRED DONALDSON 220 ELM STREET, SUITE 100 LEWISVILLE, TX 75057 Fax Number: (972) 219-7099 Project Desc: SALON ON THE CREEK 684 SOUTH DENTON TAP ROAD Our Report No.: 02741-13 Issue Date: 11/O4/2002 FIELD DA TA Placement Locetlon: PIERS; A-2, A-l, B-l, D-l, E-l, F-1 Date Placed: 10/24/02 Time Placed: N/A Slump (ASTM C-143): N/A Air Content: N/A Air Tempemtura: N/A Specimen Temperature: N/A Date Received: 10/25/02 Detlvsry Method: PICKED UP BY ALPHA Field Data Submitted By:. Mix Date Submitted By: N/A Plant Number: N/A Delivery Ticket No.: N/A Made By: Curad Speclflcetlon: ASTM C-31 CYLINDER COMPRESSION TEST RESUL TS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Tested: (Da~s): Len~lth Width Diameter Sq. In. Load: PSI: 13 LAB C-1231 10/31/02 7 12 N/A 6 28.27 78710 2780 14 LAB 11/21/02 28 12 N/A 6 28.27 0 15 LAB 11/21/02 28 12 N/A 6 28.27 0 16 LAB HOLD HOLD 12 N/A 6 28.27 0 Specifications: 28 3000 N/A Results to Date: Notes: CLIENT MADE CYLINDERS CC: CD CONSTRUCTION CONSULTING, TRI-STAR CONSTRUCTION, CITY OF COPPELL Respectfully Submitted By: ,/'/~/ of Alpha Testing, Inc. Our test results and reports am for the exclusive use of the Client (and their designated recepients on file in our office) and shall not be reproduced and/or dis~buted except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are nol indicative of the qualities of apparently identical or similar specimens.