Creekview P2 L1R BA-LR021104ALPHA TESTING, INC.
2209 Wisconsin St., Suite 10
Dallas, Texas 75229
(972) 620-8911
Concrete Compression Test
Report
Tested For: TRI-STAR CONSTRUCTION
A~-i'N: MR. FRED DONALDSON
220 ELM STREET, SUITE 100
LEWISVILLE, TX 75057
Fax Number: (972) 219-7099
Project Desc: SALON ON THE CREEK
684 SOUTH DENTON TAP ROAD
Our Report No.: 02741-13
Issue Date: 11/O4/2002
FIELD DA TA
Placement Locetlon: PIERS; A-2, A-l, B-l, D-l, E-l, F-1
Date Placed: 10/24/02
Time Placed: N/A
Slump (ASTM C-143): N/A
Air Content: N/A
Air Tempemtura: N/A
Specimen Temperature: N/A
Date Received: 10/25/02
Detlvsry Method: PICKED UP BY ALPHA
Field Data Submitted By:.
Mix Date Submitted By: N/A
Plant Number: N/A
Delivery Ticket No.: N/A
Made By:
Curad Speclflcetlon: ASTM C-31
CYLINDER COMPRESSION TEST RESUL TS
Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max
No.: Type: Spec: Tested: (Da~s): Len~lth Width Diameter Sq. In. Load: PSI:
13 LAB C-1231 10/31/02 7 12 N/A 6 28.27 78710 2780
14 LAB 11/21/02 28 12 N/A 6 28.27 0
15 LAB 11/21/02 28 12 N/A 6 28.27 0
16 LAB HOLD HOLD 12 N/A 6 28.27 0
Specifications: 28 3000
N/A
Results to Date:
Notes: CLIENT MADE CYLINDERS
CC: CD CONSTRUCTION CONSULTING, TRI-STAR CONSTRUCTION, CITY OF COPPELL
Respectfully Submitted By: ,/'/~/ of Alpha Testing, Inc.
Our test results and reports am for the exclusive use of the Client (and their designated recepients on file in our office) and shall not be reproduced and/or dis~buted
except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples
tested and/or observed, and are nol indicative of the qualities of apparently identical or similar specimens.