Loading...
Creekview P2 L1R BA-LR021003ALPHA TESTING. INC. 2209 Wisconsin St., Suite I00 Dallas, Texas 75229 972/620-8911 - 972/263~4937 (Metro) FAX: 972/406-8023 TESTED FOR TRI-STAR CONSTRUCTION LEWISVILLE., TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 10/03/02 PROJECT SALON ON THE CREEK COPPELL, TEXAS OUR REPORT NO.: 02741-1 TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF I 10/03/02 SG 1 18.5 104.5 21.7 101 97 2-A 2 10/03/02 SG 1 18.5 104.5 22.5 100 96 2-A 3 10/03/02 SG 1 18.5 104.5 20.6 106 101 2-A 4 10/03/02 SG 1 18.5 104.5 18.9 108 103 2-A TEST LOCATION: 1 10' N AND 10' W FROM SW CORNER OF BUILDING PAD 2 15' S AND 20' W FROM NW CORNER OF BUILDING PAD 3 10' N AND 10' E FROM SE CORNER OF BUILDING PAD 4 15' S AND 20' E FROM NE CORNER OF BUILDING PAD CC: CITY OF COPPELL 1. FILL · A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Resp~lly Subm~t~l/~j 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST O~r test results & reports are for the exc~ualve use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or di~ express approval of ALPH.~ The use of our name & test results must receive Our wntten approval. Test results & reports apply only to the samples tested and/or obsen~ed, and are not indicative of the qualities of apparently identical or similar specimens. Geotechnical Engineering /~ Construction Materials Testing /~ Environmental Engineering /~ Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallos, Tex~s 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR TRI-STAR CONSTRUCTION LEWlSVILLE., TEXAS PROJECT SALON ON THE CREEK COPPELL, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 10/03102 OUR REPORT NO.: 02741-2 TEST DATA: TEST ~ ELEV.I SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO, DATEDEPTH~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* 5 10103102 FG 2 14.0 115 14.7 112 97 1-A 6 10103102 FG 2 14.0 115 15.2 112 98 1 -A 7 10/03/02 FG 2 14.0 115 15.5 111 97 1-A 8 10/03~02 FG 2 14.0 115 16.1 111 96 1 -A TEST LOCATION: 5 10' N AND 10' W FROM SE CORNER OF BUILDING PAD 6 10' S AND 10' W FROM NE CORNER OF BUILDING PAD 7 15' N AND 15' E FROM SW CORNER OF BUILDING PAD 8 15' S AND t5' E FROM NW CORNER OF BUILDING PAD CC: CITY OF COPPELL 1 FILL · A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Res.~.~lly 3 LIME STAB,LIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICAT,ONS 4 CEMENT TREATED D RETEST ~ ALPHA~E~.T.L~ , ~~s ao-~oroval of ALPHA Th .... Geotechmcal Engineering · Construction Matenals Testing · Environmental Engineering · Consulting