Loading...
Freeport NIP(7.0)-LR030219..Rone 1 A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION REQUIREMENTS STRENGTH: SLUMP (in): AIR TEST METHOD: CYLINDER MARKED SET NO. 1 1 1 2 5.0 1 3 5.0 1 4 5.0 Technician: Jason Astiz Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, 12 (1) City of Coppell Engineering Dept. (1) Potter Concrete Duke Realty Services, LP Potter Concrete NA 4000 psi 28 Days 3"-5" 3% 6% ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 MEASURED SLUMP (inches) Water added at site: 10 gallons 6 4 1 61°4 v\- VI LE LOCATION: Same as above Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) DATE TESTED 5.0 02/18/2003 03/11/2003 03/11/2003 04/08/2003 CONCRETE COMPRESSIVE STRENGTH TEST PROJECT DATA REPORT OF TESTS MIX DESIGN I.D.: 9685 PLACEMENT DATE: 02/11/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 9:30am TEMPERATURE (F) AIR 48 TRUCK NO: 116 AIR CONTENT 6.0 AGE (days) 7 28 28 56 Started: 6:30am Finished: 12:OOpm (1) Pacheco Koch Consulting Engineers (1) Engineering Analyst MAXIMUM LOAD (lbs. force) 88205 Report No.: Project No.: Date of Service: Report Date: 170539 037333 02/11/2003 02/19/2003 BATCH TIME: 8:09am P CONCRETE: 62 F TICKET NO: 113479 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Paving southeast approach, 15' north of south end and 5' west of east end COMPRESSIVE STRENGTH (psi) 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630 -9745 (214) 630-9819 (fax) FRACTURE TYPE 3120 Unbonded Cap Unbonded Cap Unbonded Cap Unbonded Cap /YANA K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. OIDK Page 1 of 1 RoneEngineers to A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 752-54 Project: Services: Technician Time: 6:30 AM 1:00 PM Page 1 of 3 Freeport 10 500 Freeport Parkway Coppell, TX Water Injection Inspection Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (I) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers 8908 Ambassador Row Dallas, Texas 75247 -4510 (214)630 -9745 (214) 630-9819 (fax) REPORT OF WATER INJECTION INSPECTION (1) Engineering Analyst Report of Inspection Report No.: Project No.: Date of Service: Report Date: On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. 170837 037333 02/15/2003 02/19/2003 K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DF Page 1 of 1 DESCRIPTION /EXPLANATION YES NO N/A 1. Specific gravity of lime was checked and found to be 1.14 and 1.17 2. Lime slurry was continuously agitated 3. Surfactant was added to each load X 4. The injection pressure was kept between 50 to 100 psi at point of injection X 5. Intervals of 12" were achieved during injection process until refusal X 6. Total depth of injection 10 feet X 7. Max. spacing of injection probes was recorded to be 5 ft. X 8. Free lime on surface 9. Square feet injected on this date 108,000 10. Location of injection Building Pad in Area C #3 Client: Duke Realty Services, LP Project: Freeport 10 500 Freeport Parkway Coppell, TX Remarks: 1st pass Time: Technician: WATER INJECTION OBSERVATION Report No.: 170837 Project No.: 037333 Date of Service: 2/15/2003 Page 2 of 3 See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. 6:30 AM 1:OOPM Lanny Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation In quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 1 1 1•. 1 1 1 1 `7 ln 1 1 a r `4\�� i.1 4 H411 911 1 16. -1 i -I-I- 11111111 kQ,'1 cn J i II RoneEngineers M A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 752.54 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Water Injection Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: 7:00 AM 5:30 PM Page 1 o 3 Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers (1) Engineering Analyst Report of Inspection Report No.: Project No.: Date of Service: Report Date: K. Scott Watson CMT Operations Manager 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630-9745 (214) 630 -9819 (fax) REPORT OF WATER INJECTION INSPECTION 170825 037333 02/14/2003 02/19/2003 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DF Pace 1 of 1 DESCRIPTION /EXPLANATION YES NO N/A 1. Specific gravity of lime was checked and found to be 1.14 and 1.17 2. Lime slurry was continuously agitated 3. Surfactant was added to each load X 4. The injection pressure was kept between 50 to 100 psi at point of injection X 5. Intervals of 12" were achieved during injection process until refusal X 6. Total depth of injection 10 feet X 7. Max. spacing of injection probes was recorded to be 5 ft. X 8. Free lime on surface 9. Square feet injected on this date 35,000 10. Location of injection Building pad in Area C Client: Duke Realty Services, LP Project: Freeport 10 500 Freeport Parkway Coppell, TX WATER INJECTION OBSERVATION Remarks: Standby time 7:30 AM p 1:00 PM. Injector equipment stuck in mud. Time: Technician: 7:00 AM 5:30 PM Lanny Gist Report No.: 170825 Project No.: 037333 Date of Service: 2/14/2003 Page 2 of 3 See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. T• `1:' I 1: is' I (16 IS 1 111 141.0=01 i: oral' I go. (1111%.2111 Or. L ii4k -'11-- -4—.- .jt 4 I .-1- I I r ujc -do _1 .m Ti —I_ 7 _6----1. ,,I__ 1 .....L. I.- 1 4 f -Hi-P-1414d- I 0, 1 1 1 1 -Z.r. 29 L U1 41 .151 i t r Jrj1.• I I -.II 1 II I I 7 I, .1 I I Fr: t I i tri iii.-, .klir' 7 7 II •II/ 1 r" ja tb: 4 4 I. I, r .:=N" cE= rib RaneEng A LEIGH COMPANY Project: Services: Page 1 of 3 Freeport 10 500 Freeport Parkway Coppell, TX Water Injection Inspection Technician: David Wallace Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers neers Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Technician Time: 6:30 AM 5:00 PM REPORT OF WATER INJECTION INSPECTION (1) Engineering Analyst Report of Inspection Report No.: Project No.: Date of Service: Report Date: On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. 170756 037333 02/13/2003 02/19/2003 K. Scott Watson CMT Operations Manager 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630 -9745 (214) 630 -9819 (fax) LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DF Pace 1 of 1 DESCRIPTION /EXPLANATION YES NO N/A 1. Specific gravity of lime was checked and found to be 1.14 and 1.17 X 2. Lime slurry was continuously agitated X 3. Surfactant was added to each load X 4. The injection pressure was kept between 50 to 100 psi at point of injection X 5. Intervals of 12" were achieved during injection process until refusal X 6. Total depth of injection 10 feet X 7. Max. spacing of injection probes was recorded to be 5 ft. X 8. Free lime on surface X 9. Square feet injected on this date 10. Location of injection Building pad Client: Duke Realty Services, LP Project: Freeport 10 500 Freeport Parkway Coppell, TX WATER INJECTION OBSERVATION Remarks: See drawing for location of injection. Down time 3:00 PM moving equipment. Report No.: 170756 Project No.: 037333 Date of Service: 2/13/2003 Page 2 of 2 See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: Technician: 6:30 AM 5:00 PM David Wallace LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 111111111 e L 1-121°. I 0 -0-rf- th a WIEDIEU !ITN 1-7 11 II 111411 -i-- r 1 1 I T1717 1.= pop r g E E -4- I- P:!=. ":-L; 1 1 1 I 1 1 -1 I 14 I 1 _1 1 1_ 7 T -1 I 4 t t.7e't it t 1_ wn 1 ri It f --H 41 I itl I' I I 5 1 -41 1 --L.— 1_ RoneEngineers M A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: CONTRACTOR: Duke Realty Services, LP Test Methods: ASTM D 2922 ASTM D 3017 M/D No. Freeport 10 500 Freeport Parkway Coppell, TX Perform In -Place Density Test in accordance with ASTM Standards. Description 1 Tan Grayish Brown Clay w/ Traces of Sand TEST NO TEST LOCATION FM 1 400' west x 100' north of the southeast corner of the building pad, 2nd lift FM 2 300' west x 200' north of the southeast corner of the building pad, 2nd lift Fill 3 500' west x 200' north of the southeast corner of the building pad, 2nd lift Fill 4 500' west x 150' north of the southeast corner of the building pad, 2nd lift Fill 5 500' west x 200' south of the northeast corner of the building pad, 2nd lift PROJECT DATA Gauge: Troxler 3430 Gauge Serial No: 32720 Test Mode: DT Current: 668 Previous: 661 MOISTURE DENSITY RELATIONS Maximum Moisture Density pcf FIELD DENSITY TESTS Report No.: Project No.: Date of Service: Report Date: Standard Counts Moisture Density 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630-9745 (214) 630 -9819 (fax) IN -PLACE DENSITY TESTING 170758 037333 02/13/2003 02/19/2003 Current: 3088 Previous: 3116 Project Requirements Moisture Density 21.5 103.5 Optimum +5 95 min PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (pcf) (pc[) max) 6" 1 24.5 124.0 99.6 96 6" 1 22.0 125.5 102.9 99 6" 1 21.9 123.5 101.3 98 6" 1 21.8 120.9 99.3 96 6" 1 22.6 127.1 103.7 100 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DF Page 1 of 2 Report No.: 170758 Project No.: 037333 Client: Duke Realty Services, LP TEST NO Fill 6 400' west x 200' south of the northeast 6" 1 corner of the building pad, 2nd lift Test results on this report meet project specification. Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers TEST LOCATION Started: 6:30AM Finished: 5:OOPM (1) Engineering Analyst PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (pci) (pct) max) 25.0 128.3 102.6 99 RoneElineers K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DF Page 2 of 2 RoneEng veers A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: CONTRACTOR: Duke Realty Services, LP Test Methods: ASTM D 2922 ASTM D 3017 M/D No. TEST NO Freeport 10 500 Freeport Parkway Coppell, TX Perform In -Place Density Test in accordance Description 1 Tan Grayish Brown Clay w/ Traces of Sand TEST LOCATION Fill 1 100' west x 75' north of the southeast comer of the building pad, 1st lift Fill 2 200' west x 75' north of the southeast corner of the building pad, 1st lift FM 3 300' west x 100' north of the southeast corner of the building pad, 1st lift Fill 4 300' west x 200' north of the southeast corner of the building pad, 1st lift Fill 5 300' west x 25' north of the southeast corner of the building pad, 1st lift with ASTM Standards. PROJECT DATA Gauge: Troxler 3430 Gauge Serial No: 32720 Test Mode: DT MOISTURE DENSITY RELATIONS Maximum Moisture Density pcf FIELD DENSITY TESTS M/D No. 6" 1 6" 1 6" 1 6" 1 6" 1 PROBE DEPTH 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630-9745 (214) 630 -9819 (fax) IN -PLACE DENSITY TESTING Report No.: 170616 Project No.: 037333 Date of Service: 02/12/2003 Report Date: 02/19/2003 Standard Counts Moisture Density Current: 661 Current: 3116 Previous: 659 Previous: 3076 Project Requirements Moisture Density 21.5 103.5 Optimum +5 95 min MOISTURE WET DENSITY DRY DENSITY DENSITY (pcf) (pcf) max) 25.5 126.9 101.1 23.7 124.8 100.9 24.9 128.3 102.7 23.0 126.4 102.8 21.6 121.8 100.2 98 97 99 99 97 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Roue Engineers, Ltd. 07DF Page 1 of 2 Report No.: 170616 Project No.: 037333 TEST NO TEST LOCATION Client: Duke Realty Services, LP Fill 6 200' west x 25' north of the southeast corner of the building pad, 1st lift Fill 7 100' west x 25' north of the southeast corner of the building pad, 1st lift Fill 8 300' west x 25' south of the northeast corner of the building pad, 1st lift Fill 9 400' west x 25' south of the northeast corner, 1st lift Fill 10 500' west x 25' south of the northeast corner, 1st lift Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers PROBE M/D DEPTH No. 6" 1 6" 1 6" 1 6" 1 6" 1 Test results on this report meet project specilicatio Started: 6:30A Finished: 5:OOPM (1) Engineering Analyst K. Scott Watson CMT Operations Manager RoneEnlineers MOISTURE WET DENSITY DRY DENSITY DENSITY (pet) (pct) max) 21.9 126.3 103.6 100 24.5 128.6 103.3 100 24.1 122.4 98.6 95 21.9 121.9 100.0 97 21.7 122.8 100.9 97 n M Ro a LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DF Page 2 of 2 RoneEng.neers A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 752-54 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Water Injection Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time. 7:30AM 4:30PM Page 1 of 3 Technician: David Wallace Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers (1) Engineering Analyst Report of Inspection Report No.: Project No.: Date of Service: Report Date: 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630-9745 (214) 630 -9819 (fax) REPORT OF WATER INJECTION INSPECTION 170615 037333 02/12/2003 02/19/2003 4 400 Ariat colt Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DF Page 1 of 1 DESCRIPTION /EXPLANATION YES NO N/A 1. Specific gravity of lime was checked and found to be 1.14 and 1.17 x 2. Lime slurry was continuously agitated X 3. Surfactant was added to each load x 4. The injection pressure was kept between 50 to 100 psi at point of injection x 5. Intervals of 12" were achieved during injection process until refusal X 6. Total depth of injection 10 feet X 7. Max. spacing of injection probes was recorded to be 5 ft. X 8. Free lime on surface x 9. Square feet injected on this date 129,100 total 23,100 3rd pass 10. Location of injection Building Pad Client: Duke Realty Services, LP Project: Freeport 10 500 Freeport Parkway Coppell, TX Remarks: See drawing for details. Time: Technician: WATER INJECTION OBSERVATION 7:30 AM 4:30 PM David Wallace Report No.: 170615 Project No.: 037333 Date of Service: 2/12/2003 Page 2 of 3 See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation In quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except In full without the written approval of Rone Engineers, Inc. 2 ffrat N '72 .110 111 1111 in 43. W %MU 0. Nei I_ NI 0/1111ft 11U._ r l i N at* NV.Z.N.S. 1 1 =Ws v. sls: sm,-. r.-...., -1 f 1-2- -4 I -I- 1 I u-i= I' 1 r1 t 1 Pi iCel l 1 ht t I V I:l f3 'r 7 -7-1- IT 1 f 1 0111 3 F i -1--1 7 -.1--4- 4 -4--I-. 7 I O X rLI I j 1'i-11111W T 1,1 t 1 2 1 -:--1it ,-q J. -L-I u■ 0 I --1-- 1, 1 1 1 T 1 Pi_ o o 7 I LO ss I II -PP RoneEngineers A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Daily Activities See report #170616 for technician time. Page 1 of 1 Technician: Lanny Gist Report Distribution: (I) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers (1) Engineering Analyst Report of Activities REPORT OF DAILY ACTIVITIES Report No.: 170614 Project No.: 037333 Date of Service: 02/12/2003 Report Date: 02/19/2003 On this date, a Rone Engineers, Ltd. representative(s) was at the above project for site observations. Hayward Baker continued water injection in Area B of the building pad. Cooper Excavation excavated fill material from the northwest pond and hauled it to the east side of the building pad. Moisture and in -place density tests were taken on compacted fill. The tests were found in compliance with the job specifications. The equipment used by Hayward Baker was four D -3 Caterpillar Injection Rigs. Cooper Excavation used two 621 Caterpillar Scrapers, one 963 Caterpillar Loader, one 815 Caterpillar Compactor, one TA30 Terex Dump Truck, two TA27 Terex Dump Trucks, one D -8 Caterpillar Dozer, one 12G Caterpillar Blade, and one 3300 Kobelco Trackhoe. K. Scott Watson CMT Operations Manager 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630-9745 (214) 630 -9819 (fax) LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DF Page 1 of 1 RoneEngineers A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: Page 1 of 3 Freeport 10 500 Freeport Parkway Coppell, TX Water Injection Inspection Technician Time: 6:30 AM 5:00 PM Technician: David Wallace Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco ICoch Consulting Engineers 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630-9745 (214) 630 -9819 (fax) REPORT OF WATER INJECTION INSPECTION (1) Engineering Analyst Report of Inspection Report No.: Project No.: Date of Service: Report Date: On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. 170537 037333 02/11/2003 02/19/2003 K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DF Pane 1 of 1 DESCRIPTION /EXPLANATION YES NO N/A 1. Specific gravity of lime was checked and found to be 1.14 and 1.17 x 2. Lime slurry was continuously agitated x 3. Surfactant was added to each load x 4. The injection pressure was kept between 50 to 100 psi at point of injection x 5. Intervals of 12" were achieved during injection process until refusal X 6. Total depth of injection 10 feet x 7. Max. spacing of injection probes was recorded to be 5 ft. x 8. Free lime on surface X 9. Square feet injected on this date 149,000 10. Location of injection Building Pad Area 2B Client: Duke Realty Services, LP Project: Freeport 10 500 Freeport Parkway Coppell, TX WATER INJECTION OBSERVATION Report No.: 170537 Project No.: 037333 Date of Service: 2/11/2002 Page 2 of 3 Remarks: 246,900 gallons of water. 12:15PM 1:30PM stand -by time. Moved Equipment. See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: Technician: 6:30 AM 5:00 PM David Wallace LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control, Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. g CIO 007 .10 .:11 .0 Ow 11 A) II rOC"LL -C1 lJO RoneEngineers A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Daily Activities On this date, a Rone Engineers, Ltd. representative(s) was at the above project for on site observations. Hayward Baker continued water injection in Section B of the building pad. Cooper Excavation continued cutting material from the pond located at the northwest corner of the site, hauling and compacting at the east side of the building pad. Moisture and in -place density tests were taken to insure compliance with the job specifications. Equipment used by Hayward Baker was four D -3 Caterpillar Injection Rigs. Cooper Excavation used the following equipment: one TA30 Terex Dump Truck, two TA27 Terex Dump Truck, one 963 Caterpillar Loader, one 815 Caterpillar Compactor, two 623 Caterpillar Scrapers, one G -12 Caterpillar Blade, one D8 Caterpillar Dozer, and one 3300 Kobelco Trackhoe. Technician Time: 4:00 PM 5:30 PM Page 1 of 1 Technlcian: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept (1) Pacheco Koch Consulting Engineers (I) Engineering Analyst Report of Activities 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630-9745 (214) 630 -9819 (fax) REPORT OF DAILY ACTIVITIES Report No.: 170540 Project No.: 037333 Date of Service: 02/11/2003 Report Date: 02/19/2003 K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DF Page 1 of 1 RoneEngineers. A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Daily Activities On this date, a Rone Engineers, Ltd. representative(s) arrived on site to assist the lead technician in water injection inspection. The technician monitored the injection process of two rigs. The injection process consisted of four ten foot probes. The probes were spread five feet apart and were injected at one foot intervals to a depth of ten feet. Once the rig obtained refusal, it would move forward five feet and repeat the process. See report #170537 for square footage and total gallons of water used. The Rone representative assisted the lead technician in the staking of the job site for borings to be drilled to check for moisture and swell. Technician Time: 6:30 AM 12 :30 PM 2:00 PM 5:30 PM Page 1 of 1 Technician: Eric Goodwin Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers (1) Engineering Analyst Report of Activities REPORT OF DAILY ACTIVITIES Report No.: Project No.: Date of Service: Report Date: 170536 037333 02/11/2003 02/19/2003 K. Scott Watson CMT Operations Manager 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630-9745 (214) 630 -9819 (fax) LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DF Page 1 of 1 RoneEngi M1 A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: CONTRACTOR: Duke Realty Services, LP Test Methods: ASTM D 2922 ASTM D 3017 M/D No. TEST NO nears Freeport 10 500 Freeport Parkway Coppell, TX Perform In -Place Density Test in accordance with ASTM Standards. Description TEST LOCATION Fill 1 500' west x 200' south of the northeast corner of the building pad, 1st lift FM 2 400' west x 200' south of the northeast corner of the building pad, lst lift Fill 3 500' west x 250' south of the northeast corner of the building pad, 1st lift Fill 4 400' west x 250' south of the northeast corner of the building pad, 1st lift Fill 5 500' west x 350' south of the northeast corner of the building pad, 1st lift PROJECT DATA Gauge: Troxler 3430 Gauge Serial No: 32720 Test Mode: DT 1 Tan Grayish Brown Clay w/ Traces of Sand Previous: 663 MOISTURE DENSITY RELATIONS Maximum Moisture Density pef FIFI,I) DENSITY TESTS IN -PLACE DENSITY TESTING Current: 659 Report No.: 170538 Project No.: 037333 Date of Service: 02/11/2003 Report Date: 02/19/2003 Standard Counts Moisture Density 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630 -9745 (214) 630 -9819 (fax) Current: 3076 Previous: 3090 Project Requirements Moisture Density 21.5 103.5 Optimum +5 95 min PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (pcf) (pci) max) 6" 1 22.2 123.4 101.0 98 6" 1 22.0 122.4 100.3 97 6" 1 24.6 123.9 99.4 96 6" 1 24.9 129.4 103.6 100 6" 1 22.5 127.4 104.0 100 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DP Page 1 of 2 Report No.: 170538 Project No.: 037333 Client: Duke Realty Services, LP TEST NO TEST LOCATION RoRogine PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (pcf) (pcf) max) Fill 6 400' west x 350' south of the northeast 6" 1 21.9 123.0 100.9 97 corner of the building pad, 1st lift Fill 7 500' west x 400' south of the northeast 6" 1 23.2 125.7 102.0 99 corner of the building pad, 1st lift Fill 8 400' west x 400' south of the northeast 6" 1 24.6 127.6 102.4 99 corner of the building pad, 1st lift Test results on this report meet project specification. Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, I.P (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers Started: 10:OOA Finished: 4:OOPM (1) Engineering Analyst K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 117DF Page 2 of 2 RoneE.nganeers.. A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter Concrete PLANT: NA SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi 28 Days SLUMP (in): 5" maximum AIR 3% 6% TEST METHOD: ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 4.00 1 2 4.00 1 3 4.00 1 4 4.00 Water added at site: 15 gallons Technician: Ryan Herbrand Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (I) Potter Concrete DATE TESTED 02/08/2003 02/11/2003 03/04/2003 03/04/2003 CONCRETE COMPRESSIVE STRENGTH TEST Started: 8:30am PROJECT DATA Report No.: Project No.: Date of Service: Report Date: MIX DESIGN I.D.: 9685 PLACEMENT DATE: 02/04/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 9:45am BATCH TIME: 9 :O5am TEMPERATURE (F) AIR 34 F CONCRETE: 56 F TRUCK NO: 102 TICKET NO: 113461 AIR CONTENT 4.4 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Freeport Parkway approach beginning at the north end of the pad and ending at the south end of the pad SAMPLE LOCATION: North approach to the pad REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) AGE (days) 4 7 28 28 (1) Pacheco Koch Consulting Engineers (l) Engineering Analyst Finished: 1:30pm MAXIMUM LOAD (lbs. force) 145590 147950 COMPRESSIVE STRENGTH (Psi) K. Scott Watson CMT Operations Manager 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630 -9745 (214) 630-9819 (fax) 170184 037333 02/04/2003 02/12/2003 FRACTURE TYPE 5150 Unbonded Cap 5230 Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. OIDK Page 1 of 1