Loading...
Gateway BP(1.4)-CS030226Date: February 26, 2003 T H E C 1 T Y O F COPPELL MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: 'Ken Griffin, Director of Engineering Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal From: Larry Davis, Construction Inspector J ,R2;. Office Phone: (972) 304 -3684 Fax: (972) 304 -3570 cc: Paris, P.E., Halff Assoc. Burns Construction fax 972 221 -8301 Catellus Development fax 972 419 -1922 RE: WALK THRU for Haverty's Drainage Improvements and Exchange Circle Reconstruction POSTPONED A final walk -thru for paving, sanitary sewer, water and storm drainage on the referenced project has been postponed due to inclement weather until: Thursday, March 13 at 2:00 p.m. If this later date does not hold because of continued wet weather, you will be notified. Please let me know if I can be of further assistance. "CITY OF COPPELL ENGINEERING EXCELLENCE BY DESIGN"