Gateway BP(1.4)-CS030226Date: February 26, 2003
T H E C 1 T Y O F
COPPELL
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: 'Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
From: Larry Davis, Construction Inspector J ,R2;.
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
cc: Paris, P.E., Halff Assoc.
Burns Construction fax 972 221 -8301
Catellus Development fax 972 419 -1922
RE: WALK THRU for Haverty's Drainage Improvements
and Exchange Circle Reconstruction POSTPONED
A final walk -thru for paving, sanitary sewer, water and storm drainage on the referenced
project has been postponed due to inclement weather until:
Thursday, March 13 at 2:00 p.m.
If this later date does not hold because of continued wet weather, you will be notified.
Please let me know if I can be of further assistance.
"CITY OF COPPELL ENGINEERING EXCELLENCE BY DESIGN"