Loading...
PA9702-LR 990811 (2) CONCRETE COMPR IVE STRENGTH TES? 8901 Carl~nter Frwy., Suite #100 Dallas, Texas 75247 Dateof Service: 08/02/1999 Report No.: 9920846 Report Date 08/11/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: ~btainsamp~es~ffreshc~ncreteatthep~acementlocati~ns~perf~rmrequired~e~dtestandcast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 08/02/1999 BATCH TIME: 8:04am PLANT: N/A TIME SAMpLED: 8:30am BY: Harvey Plunk SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, hot STRENGTH: 4000 psi @ 28 Days TENWERATURE (F) - AIR 86 F CONCRETE: 89 F SLUMP: 4-5" TRUCK NO: 211 TICKET NO: 75963 AIR: N/A AreCONTENT(%): N/A UNrrWEIGHT(pe0: N/A TEST METROD: ASTM C- 143 PLACEMENT LOCATION: Swimming pool floor ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMpRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) 0bs. force) (psi) TYPE I I 6.00 08/09/1999 7 127430 45 10 1 2 6.00 08/09/1999 7 130600 4620 Average 4570 1 3 6.00 08/30/1999 28 I 4 6.00 08/30/1999 28 Sample location: Footings on south swimming pool on southwest corner of pool Technician: Harvey Plunk Started: 5:15am Finished: 9:00am H~ Engineering, Inc. Report Distribution: ~ ~' C (1) City of Coppell (1) City ofCoppell - Engineering (1) BrinkIcy Sargent ArchiteeS (1) City of Coppelt - Bldg. Insp. Eugene Hatbout (l) Turner Engineers (1) City ofCoppell - Leisure Serv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without die written approval of HBC Engineering, inc. 0ILL Page 1 of I