Loading...
MA FY 97/98-CN 980414AGENDA REQUEST FORM r ITEM CAPTION: Consider approval of extending Bid Q -0196 -01 for the 1998 Street Repair Project to Abcon Paving for an amount not to exceed $80,000.00 APPAU QED? CITY Y C UNCIL. SUBMITT BY: Kenneth M. Griffin, P.E. DATE TIT E• Dir. of Engineerin orks STAFF RE APPROVAL STAFF COMMENTS: On February 6, 1996, five bids were received and opened for the 1996 Pavement Replacement Program. The low bidder was Abcon Paving. Abcon Paving has since completed that project. However, the contract with Abcon Paving included provisions for the City Council to extend the contract for a one - year period with a maximum number of four extensions. The contract also provides a mechanism for the contractor to request a price redetermination based upon direct cost increase, wage and labor rate increase, etc. Council approved a $9.00 per square yard increase last year for the 1997 Street Repair Program This was based on an increase in concrete and labor costs in the previous year. The $9.00 per square yard increased the total price per square yard to $52.50. At the time of bid, the next low bidder to Abcon Paving was at $52.40. The original bid assumed the contractor would pour six inches of concrete over eight inches of base material for street repairs. We have identified a project that will require eight inches of concrete (Royal Lane). Abcon has submitted an acceptable quote of $54.90 per square yard in the attached letter. Because Abcon Paving was responsive and performed an excellent job for the City of Coppell in 1996 and 1997, and because their price remains competitive, if not lower than what an open bid would provide to the City of Coppell, my recommendation is for the City Council to extend Bid Q- 0196 -01 in an amount not to exceed $80,000.00 for the 1998 Pavement Replacement Program Staff will be available to answer questions at Council meeting. BUDGET AMT. $ AMT. EST. $ +/- BUD:$ FINANCIAL COMMENTS: Ponds have been budgeted in the Street Department Maintenance Account (01 -1 -3210) for the street repair program. DIR. INITIALS: / FIN. REVIEW: Agenda Request Form - Revised a/98 CITY MANAGER REVI Document Name: #abcon 04/0 3/98 10:12 CIT�^OF COPPELL 4 CITY OF COPPELL NO.233 902 Abc Paving, Inc 1045 E l�wy. 121 Lewisville. Texas 75057 Anril 2. 1998 City of Connell Street Department 1'.0. Box 478 Connell, Texas 75019 Attn: Mr. Curtis °now Re: Concrete Street Repairs Aid No. 4- 0196 -0:1 Dear Mr. Snow: A.hcon Paving, Inc. requests that the above referenced conctract be extended for an additional r..eriod of one wear. Our prices for the contract extension will remain the same as in 1947 Lasted below are the prices for 1997. 6" Concrete - $52.50 /5Y 7" Concrete - $53.70/SY 8" Concrete - $54.90 /SY Sou7_d you have anv questions, please feel free to contact me. erely, 1 C mes 0. Jenkins President Lewiswe -(214) 221 -7535 ... Metro- 12141434 -2811 ... Arlington -18171 275 -2242 r-" STg6.036 The City With A Beautiful Future April 10, 1998 Abcon Paving 1045 East Highway 121 Lewisville, Texas 75057 Attention: Mr. James O. Jenkins, President Dear Mr. Jenkins: P.O. Box 478 Coppell, Texas 75019 214 -462 -0022 We are pleased to inform you that it is the City of Coppell's intent to offer you an extension on your Street Repair Project based on your original bid of $43.50 per square yard (Bid No. Q- 0196 -01), plus the approved "Price Redetermination" of $9.00 per square yard approved May 27, 1997. Tentatively, the projects listed below will be scheduled and work will be performed in accordance with our existing contract in priority order. Moore Road immediately north of Sandy Lake 420 sq. yds. Moore Road across from Indian Rock 106 sq. yds. Freeport north of I -635 33 sq. yds. Royal Lane at Creekview 808 sq. yds. The offer of this extension is predicated upon the City of Coppell Council approval. Upon approval, you will be given notice to proceed immediately. Thank you, and we look forward to working with you for another round of projects on the ongoing Street Repair Program. Sincerely, / ate' s w Intenm Superintendent of Public Services /mc cc: Ken Griffin, Director of Engineering and Public Services