Freeport NIP(7.0)-LR030227Ro
to
A LEIGH COMPANY
Clien
Project:
Services:
e Realty Services, LP
Attn: Mr. Jeff Longs
5495 Belt Line Suite 360
Dallas 54
Freeport 10
500 Freeport Parkway
Coppell, TX
Water Injection Inspection
Technician Time: 6:30 a.m. 4:30 p.m.
Page 1 of 3
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Engineering Dept.
(1) Pacheco Koch Consulting Engineers
v f /1
PORT OF WATER INJECTION INSPECTION
(1) Engineering Analyst
Report of Inspection
Report No.:
Project No.:
Date of Service:
Report Date:
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Water Injection Inspection. The results are attached.
K. Scott Watson
CMT Operations Manager
8908 Ambassador Row
Dallas, Texas 75247 -4510
(214) 630 -9745
(214) 630 -9819 (fax)
171135
037333
02/21/2003
02/27/2003
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Page 1 of 1
DESCRIPTION /EXPLANATION
YES
NO
N/A
I v NMvt 10 (Ot•-•000) °I
Specific gravity of lime was checked and found to be 1.14 and 1.17
N/A
Lime slurry was continuously agitated
N/A
Surfactant was added to each load
x
The injection pressure was kept between 50 to 100 psi at point of injection
x
Intervals of 12" were achieved during injection process until refusal
x
Total depth of injection 10 feet
x
Maximum spacing of injection probes was recorded to be 5 ft.
x
Free on surface water
N/A
Square feet injected on this date 115,000
Location of injection Building pad C -3 1A
Client: Duke Realty Services, LP
Project:
Remarks:
Technician Name: L. Gist
Freeport 10
500 Freeport Parkway
Coppell, TX
Technician Time: 6:30 a.m. 4:30 p.m.
WATER
INJECTION OBSERVATION
Report No.: 171135
Project No.: 037333
Date of Service: 2/21/2003
Page2of3
continued 3rd pass on area C -3, began 4th pass area 1A
See attached for sketch of injected area, pass number for each area, dimension of injection area,
and amount of lime used on this date.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility
for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions
over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be
reproduced except in full without the written approval of Rone Engineers, Ltd.
14'•
voo
1
tni I
1.N.N ■04. I 1
lb lio
11,.
tio
lao
14.0:111011111
11111111
RoneEngineers
A LEIGH COMPANY
Client: Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project:
Services:
Page 1 of 3
Freeport 10
500 Freeport Parkway
Coppell, TX
Water Injection Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Water Injection Inspection. The results are attached.
Technician Time: 6:30 a.m. 5:30 p.m.
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Engineering Dept.
(1) Pacheco Koch Consulting Engineers
(1) Engineering Analyst
Report of Inspection
Report No.:
Project No.:
Date of Service:
Report Date:
K. Scott Watson
CMT Operations Manager
8908 Ambassador Row
Dallas, Tens 75247 -4510
(214) 630-9745
(214) 630-9819 (fax)
REPORT OF WATER INJECTION INSPECTION
171107
037333
02/20/2003
02/27/2003
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Page 1 of 1
1 DESCRIPTION /EXPLANATION
YES
NO
N/A
l e- CV Cr) LC) CO Is- CO 0) a I
Specific gravity of lime was checked and found to be 1.14 and 1.17
N/A
Lime slurry was continuously agitated
N/A
Surfactant was added to each load
x
The injection pressure was kept between 50 to 100 psi at point of injection
x
Intervals of 12" were achieved during injection process until refusal
x
Total depth of injection 10 feet
x
Maximum spacing of injection probes was recorded to be 5 ft.
x
Free on surface water
N/A
Square feet injected on this date 84,000
Location of injection Building pad area C -3
Client: Duke Realty Services, LP
Project:
WATER
INJECTION OBSERVATION
Remarks:
Freeport 10
500 Freeport Parkway
Coppell, TX
continued 3rd pass, began 4th pass
See attached for sketch of injected area, pass number for each area, dimension of injection area,
and amount of lime used on this date.
Technician Time: 6:30 a.m. 5:30 p.m.
Technician Name: L. Gist
Report No.: 171107
Project No.: 037333
Date of Service: 2/20 /2003
Page 2 of 3
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility
for variation In quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions
over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be
reproduced except In full without the written approval of Rone Engineers, Ltd.
I I
RoneEngineers
M
A LEIGH CO MPANY
Client: Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
Coppell, TX
Services: Daily Activities
Technician Time: 6:30 a.m. 1:00 p.m.
Page 1 of 1
Technician: Eric Goodwin
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Engineering Dept.
(1) Pacheco Koch Consulting Engineers
(1) Engineering Analyst
Report of Activities
REPORT OF DAILY ACTIVITIES
Report No.: 171106
Project No.: 037333
Date of Service: 02/20/2003
Report Date: 02/27/2003
On this date, a Rone Engineers, Ltd. representative(s) arrived on site to assist
Rone representative, Lanny Gist, in water injection inspection. E. Goodwin
monitored two water injection rig catipilar D3's. The D3's had four probes
mounted on them that were spread five foot apart and were ten foot in length.
The probes would inject water at one foot increments until rufusal was obtained
at each level. Once the D3's had obtained refusal throughout the ten feet, they
would move forward five feet and begin the process again. See report #171107 for
overall square footage and total gallons of water used on this date.
K. Scott Watson
CMT Operations Manager
8908 Ambassador Row
Dallas, Texas 75247 -4510
(214) 630-9745
(214) 630 -9819 (fax)
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Page 1 of 1
RoneEngineers
A LEIGH COMPANY
Client: Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project:
Services:
M/D No.
1
TEST
NO
Freeport 10
500 Freeport Parkway
Coppell, TX
Perform In -Place Density Test in accordance with ASTM Standards.
CONTRACTOR: Duke Realty Services, LP
Test Methods: ASTM D -2922
ASTM D -3017
Description
Tan Grayish Brown Clay w/ Traces of Sand
Fill
1 Building pad, 100' west x
northeast corner, 2nd lift
Fill
2 Building pad, 200' west x
northeast comer, 2nd lift
FM
3 Building pad, 300' west x
northeast corner, 2nd lift
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Engineering Dept.
(1) Pacheco Koch Consulting Engineers
TEST LOCATION
50' south of
50' south of
50' south of
PROJECT DATA
Gauge: Troxler 3430
Gauge Serial No: 32720
Test Mode: DT
MOISTURE DENSITY RELATIONS
Maximum
Moisture Density pcf
FIELD DENSITY TESTS
Started: 6:30a
(1) Engineering Analyst
PROBE
DEPTH
6"
6"
6"
M/D
No.
1
Previous: 654
24.6
23.5
23.4
Test results on this report meet project specification.
Finished: 9:30a
IN -PLACE DENSITY TESTING
Report No.:
Project No.:
Date of Service:
Report Date:
Standard Counts
Moisture Density
Current: 654
124.2
125.7
126.4
K. Scott Watson
CMT Operations Manager
8908 Ambassador Row
Dallas, Texas 75247 -4510
(214) 630-9745
(214) 630 -9819 (fax)
171013
037333
02/19/2003
02/27/2003
Current: 3064
Previous: 3082
Project Requirements
Moisture Density
21.5 103.5 Optimum +5 95 min
MOISTURE WET DENSITY DRY DENSITY DENSITY
(pcf) (pct) max)
99.7
101.8
102.4
96
98
99
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page 1 of 1
RoneEngineers
A LEIGH COMPANY
Client: Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
Coppell, TX
Services: Water Injection Inspection
Technician Time: 9:30 a.m. 5:30 p.m.
Page 1 of 3
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Engineering Dept.
(1) Pacheco Koch Consulting Engineers
8908 Ambassador Row
Dallas, Texas 75247 -4510
(214) 630-9745
(214) 630 -9819 (fax)
REPORT OF WATER INJECTION INSPECTION
Report of Inspection
Report No.:
Project No.:
Date of Service:
Report Date:
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Water Injection Inspection. The results are attached.
(1) Engineering Analyst
171012
037333
02/19/2003
02/27/2003
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Page 1 of 1
DESCRIPTION /EXPLANATION
YES
NO
N/A
F "cIv l
Specific gravity of lime was checked and found to be 1.14 and 1.17
N/A
Lime slurry was continuously agitated
N/A
Surfactant was added to each load
x
The injection pressure was kept between 50 to 100 psi at point of injection
x
Intervals of 12" were achieved during injection process until refusal
x
Total depth of injection 10 feet
x
Maximum spacing of injection probes was recorded to be 5 ft.
x
Free on surface water
N/A
Square feet injected on this date 120,000
Location of injection Building pad C -3
Client: Duke Realty Services, LP
Project:
WATER
INJECTION OBSERVATION
Remarks:
Freeport 10
500 Freeport Parkway
Coppell, TX
continued 2nd and 3rd pass
See attached for sketch of injected area, pass number for each area, dimension of injection area,
and amount of lime used on this date.
Technician Time: 9:30 a.m. 5:30 p.m.
Technician Name: L. Gist
Report No.: 171012
Project No.: 037333
Date of Service: 2/19 /2003
Page 2 of 3
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility
for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions
over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be
reproduced except in full without the written approval of Rone Engineers, Ltd.
eny
AD 11:77:1Fil)
T
bininiamti 1, 111 ID e• i
0
CorrELL no,o
RoneEngineers
w
A LEIGH COMPANY
Client: Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project:
Services:
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Water Injection Inspection. The results are attached.
Technician Time: 11:00 a.m. 5:30 p.m.
Page 1 of 3
Freeport 10
500 Freeport Parkway
Coppell, TX
Water Injection Inspection
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Engineering Dept.
(1) Pacheco Koch Consulting Engineers
REPORT OF WATER INJECTION INSPECTION
(1) Engineering Analyst
Report of Inspection
Report No.:
Project No.:
Date of Service:
Report Date:
170920
037333
02/18/2003
02/27/2003
K. Scott Watson
CMT Operations Manager
8908 Ambassador Row
Dallas, Texas 75247 -4510
(214) 630-9745
(214) 630 -9819 (fax)
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Page 1 of 1
I DESCRIPTION /EXPLANATION
YES
NO
N/A
I T— NM•:1'L0c0 00)OI
Specific gravity of lime was checked and found to be 1.14 and 1.17
N/A
Lime slurry was continuously agitated
N/A
Surfactant was added to each load
x
The injection pressure was kept between 50 to 100 psi at point of injection
x
Intervals of 12" were achieved during injection process until refusal
x
Total depth of injection 10 feet
x
Maximum spacing of injection probes was recorded to be 5 ft.
x
Free on surface water
N/A
Square feet injected on this date 109,000
Location of injection Area C -3
Client: Duke Realty Services, LP
Project:
WATER
INJECTION OBSERVATION
Remarks:
Freeport 10
500 Freeport Parkway
Coppell, TX
2nd pass
See attached for sketch of injected area, pass number for each area, dimension of injection area,
and amount of lime used on this date.
Technician Time: 11:00 a.m. 5:30 p.m.
Technician Name: L. Grist
Report No.: 170920
Project No.: 037333
Date of Service: 2/18 /2003
Page 2 of 3
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility
for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions
over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be
reproduced except In full without the written approval of Rone Engineers, Ltd.
7
N
1 t HRII:0111i�'llillli I(IRfunllmn�. I''�" tn
i �rz
I Jam:- IJ- 1J -I-
W thH+F+ m_i_i_i_ii_
ttttt
CCIII= TiF_Iri-1-1-1T-1-
1 li I I 6� I r -I-
-1-r- F m 1 1
C:1 ru
u
muum
/SS
6
Prei":11
RoneEngineers
to
A LEIGH COMPANY
Client: Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project:
Services:
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
water injection inspection. See report #170920 for results of inspections
Technician Time: 6:30 a.m. 11:30 a.m.
Page 1 of 1
Freeport 10
500 Freeport Parkway
Coppell, TX
Daily Activities
Technician: David Wallace
Report Distribution:
(I) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Engineering Dept.
(I) Pacheco Koch Consulting Engineers
(1) Engineering Analyst
Report of Activities
8908 Ambassador Row
Dallas, Texas 75247 -4510
(214) 630-9745
(214) 630 -9819 (fax)
REPORT OF DAILY ACTIVITIES
Report No.:
Project No.:
Date of Service:
Report Date:
170919
037333
02/18/2003
02/27/2003
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Page 1 of 1
RoneEngineers
A LEIGH COMPANY
Client: Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project:
Services:
Technician Time: 6:30 a.m. 5:00 p.m.
Page 1 of 3
Freeport 10
500 Freeport Parkway
Coppell, TX
Water Injection Inspection
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Engineering Dept.
(1) Pacheco Koch Consulting Engineers
8908 Ambassador Row
Dallas, Texas 75247 -4510
(214) 630-9745
(214) 630-9819 (fax)
REPORT OF WATER INJECTION INSPECTION
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Water Injection Inspection. The results are attached.
(1) Engineering Analyst
Report of Inspection
Report No.:
Project No.:
Date of Service:
Report Date:
170862
037333
02/17/2003
02/27/2003
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Page 1 of 1
1 DESCRIPTION /EXPLANATION
YES
NO
N/A
N M CO CO t•-• CO 0 I
Specific gravity of lime was checked and found to be 1.14 and 1.17
N/A
Lime slurry was continuously agitated
N/A
Surfactant was added to each load
x
The injection pressure was kept between 50 to 100 psi at point of injection
x
Intervals of 12" were achieved during injection process until refusal
x
Total depth of injection 10 feet
x
Maximum spacing of injection probes was recorded to be 5 ft.
x
Free on surface water
N/A
Square feet injected on this date 112,000
Location of injection Building pad area C -3
Client: Duke Realty Services, LP
Project:
Remarks:
Technician Name: L. Gist
Freeport 10
500 Freeport Parkway
Coppell, TX
Technician Time: 6:30 a.m. 5:00 p.m.
WATER
INJECTION OBSERVATION
Report No.: 170862
Project No.: 037333
Date of Service: 2/17/2003
Page 2 of 3
continued 1st pass, began 2nd pass water
See attached for sketch of injected area, pass number for each area, dimension of injection area,
and amount of lime used on this date.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility
for variation In quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions
over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be
reproduced except in full without the written approval of Rone Engineers, Ltd.
eat
11111111
7 7 0 6
i I I
4 10 4innall
ar
g
I 7.
4
I
N'Z
1 M
411111111 MTV
Ti
RoneEngineers
to
A LEIGH COMPANY
Client: Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Daily Activities
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
water injection inspection. See report #170862 for results of the inspection.
Technician Time: 6:30 a.m. 9:30 a.m.
Page 1 of 1
Technician: David Wallace
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Engineering Dept.
(1) Pacheco Koch Consulting Engineers
(1) Engineering Analyst
Report of Activities
Report No.:
Project No.:
Date of Service:
Report Date:
8908 Ambassador Row
Dallas, Texas 75247 -4510
(214) 630-9745
(214) 630 -9819 (fax)
REPORT OF DAILY ACTIVITIES
170861
037333
02/17/2003
02/27/2003
K. Scott Watson
CMT Operations Manager
LIMTTATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Page 1 of 1