Loading...
MA FY 0102-LR030115l� OI OZ Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 15 January 2003 PROJECT: City of Coppell Street Repair Project, Job 03 -007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving, 200 block of westbound Bethel School Road, 15' -35' east LOCATION OF POUR SET 2: of west creek bank and 0' -22' south of north curbline SAMPLE DATA: Truck No. Ticket No. Time Batched Time Sampled Concrete Temp. (ASTM C1064) Air Content (ASTM C231) Unit Weight (ASTM C1 38) SET 1 SET 2 226 13609170 1 1:58am 12:40pm 55 °F 4.2% MIX NO. 340L1504 Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM c39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 14 3.75 7 01/22/03 15 3.75 7 01/22/03 16 3.75 14 01/29/03 17 3.75 14 01/29/03 18 3.75 28 02/12/03 19 3.75 28 02/12/03 TECHNICIAN DISTRIBUTION CBC (12:OON- 2:00pm) (1) Pavement Services Corp. (1) City of Coppell 126,600 4480 127,900 4520 132,200 4680 130,100 4600 143,000 5060 141,200 4990 28 -Day Average 5030 4000 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148