Equitable Compensation Claims - Creekview Drive:
Item Additional
No. Description Total Cost Time (Days) Contractor's Explanation
1 Temporary Roads $14,286.53 24 Labor and equipment required to instal
remove and maintain temp. roads (flex
base) not originally phased in contract.
General Conditions � $52,620.37'"
Barricade Maintenance P $9,399.72
Concrete Labor Inefficiency Y $30,081.23
Extra Mobilization P $23,332.84
2 Extra Excavations t,5 $18,041.01 —
3 Excess Dirt Haul Off -Site L $68,121.98
4 Stock Pond Work X 17 894.95
TOTAL $233, 778.63
16
14
6
7
35
10
112
Contract Time: 150 Cal. Days
SRA's Comments
t, Contractor submitted one Phasing
Plan on 2/7/02. Temp. pvmt.
required for ingress and egress.
Compensation for labor and equipment
for additional time due to phasing.
Compensation for labor and equipment
due to phasing.
Pouring of concrete.
Mobilization due to phasing.
Additional excavation for sidewalk and There are bid quantities for this
for relocating existing stockpile. work.
Required to take excavated materials
off -site.
Addendum No. 1 addressed this
issue.
Removal of trees at stock pond.
I don't recall that ISI was
instructed to do this work.
Ute 6. 4 a w
"De vv, o
Lr-e
Co„CN&�
s d4'V
zz aT
3 dam
X11
b 23 332. $4
pvxxs;,
W
y� �"
W W
U
1b 39R 1 7 1 1
- 44
N N N
coo ssi
�ssb3�
NOO
�h
as
oaa
N C4 44
N C4 C4
X11
b 23 332. $4
1 4- ' 00131,2
2 -4- 14 Z9b .S3
1b 39R 1 7 1 1
- 44
1 TL�
�ssb3�
Cxcaudlkg uvDL-40 7 1 e� 041 .0 1
3 Gib, 121,C.N%
9 — /67• T
1Q �S
Z. 200
�OZ�
r
w
S �' /o