Loading...
Freeport NIP(7.0)-LR030305RoneEngineers A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: 6:30 a.m. 12:30 p.m. Page 1 of 3 Freeport 10 500 Freeport Parkway Coppell, TX Water Injection Inspection Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers REPORT OF WATER INJECTION INSPECTION (1) Engineering Analyst Report of Inspection Report No.: Project No.: Date of Service: Report Date: 171149 037333 02/22/2003 03/05/2003 K. Scott Watson CMT Operations Manager 8908 Ambassador Raw Dallas, Texas 75247 -4510 (214) 630-9745 (214) 630 -9819 (fax) LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Page 1 of 1 DESCRIPTION /EXPLANATION YES NO N/A 1. Specific gravity of lime was checked and found to be 1.14 and 1.17 N/A 2. Lime slurry was continuously agitated N/A 3. Surfactant was added to each load x 4. The injection pressure was kept between 50 to 100 psi at point of injection x 5. Intervals of 12" were achieved during injection process until refusal X 6. Total depth of injection 10 feet X 7. Max. spacing of injection probes was recorded to be 5 ft. X 8. Free lime on surface N/A 9. Square feet injected on this date 80,850 10. Location of injection Building pad 1 -A Client: Duke Realty Services, LP Project: Freeport 10 500 Freeport Parkway WATER INJECTION OBSERVATION Report No.: 171149 Project No.: 037333 Date of Service: 2/22/2003 Page 2 of 2 Remarks: continued 4th pass water See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: Technician: 6:30 a.m. 12:30 p.m. L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. -4 ILL 1 I 1 t I 1 r> cam r 1 I -1—r- m 1 It; 9 11 I •w I ta r: inzuni•Aposarnurn 1=111 0111111111111 1 't 1 carrEtL 10q! Mt*