ST9905-CS030204
T?Al\lSvsTEMS li1';\'
~J=>C:JRATlC>N 19J.:i
CONSULTANTS
February 4, 2003
Mr. Ken Griffin, P.E.
City of Coppell
255 Parkway
Coppell, Texas 75019
RE: Bethel Road - Addendum #1
TranSystems Project No. 20000890
Dear Mr. Griffin:
Attached is an additional fee request for additional work associated with revisions to the Bethel Road
Project. Revisions to the existing plan set include modifying the roadway width from 27 ft to 25 ft, and
the addition of three 5 ft x 10 ft Box Culverts between the east side of the USPS property and Freeport
Parkway. Additional work includes channel improvements between Freeport Parkway and Coppell Road,
including box culverts under Bethel Road. We appreciate the opportunity to present this proposal for
your consideration. Attached please find a spreadsheet with a breakout by task of the hours to perform
the work. Below is a summary of each task:
Revisions to Existing Plan Set
A.) Storm Drain Plan & Profile ~
B.) Roadway Plan & Profile-
C.) Cross Sections S\-,~-tt
D.) Additional Box Culverts (3-5'xlO')-:
Channel Improvements
A.) Channel Improvements (Freeport to Coppell Rd.) -
B.) Box Culverts (Bethel Road Crossing)
Meetings with City
Total
$3,410.00
$6,030.00
$3,410.00
$4,310.00
$5,000.00
$3,610.00
$1.080.00
$26,850.00
The following are assumptions were made to generate the fee:
1. The box culverts at the Bethel Road will be TXDOT direct load boxes.
2. These fees do not include the design of any water and sewer relocations.
Please review the enclosed information and do not hesitate to call me if you have any question or require
additional information.
Sincerely,
TranSystems Corporation
~~) !k.c/
Craig Bond, P.E.
Proj ect Manager
c.I4-'"!,
,I '.00 {:.
500 WF l'U7th ISctcreeta'ISulte 600. P11ostal1HJ,Jlit #20 . ,Fort Worth. TX 76102.4773 . Tel: (817) 339.8950 . Fax: (817) 336.2247
: sers 'Bon Bethel-Coppel/1coppe lee Increase etter.doc
Breakdown
ncrease Request
City of Coppell Bethel Road
Fee
Subtota Total
- -
-
1,080.00 -
3,410.00 -
6,030.00 -
3,410.00 -
4,310.00 -
5,000.00 -
'" ':00 ~ $ -
-
26,850.00
$
$
$
$
$
$
$
$
$
40
72
40
50
56
40
8
6
10
6
6
8
6
TASK
Plan Revisions/Add
Meetings wi City
Storm Drain Plan & Profile
Rdwy Plan & Profiles (14)
Cross Sections
101
Additional Boxes (3-5'x10')
Channel (Freeport to Coppell Rd
Bethel Rd. Crossing
Sub-Total
Miscellaneous
---1.!
0 1$ 50 0 146 0 152 0 0 $26,850.00 ==t=;:26, 850.;0
$ 6,750.00 1$- 1 $ 10'7220.00 I $ 1$ 9,880.00 T$-- 1$ I
TOTAL HOURS
TOTAL DOLLARS
Proposal for Engineering Services
F :\Users\CCBond\Bethel-Coppell\[ coppell-fee increase request.xls ]Sheet
Not included are geotechnical setvices or wetlands mitigation/permitting.