ST9905-CS030225 Ke.n G~ff'il)- BethelRoCl~ - Re."ised)l.ddi!io.n.ClIFee ~cguest From: To: Date: Subject: <ccbond@transystems.com> <kg riffin@cLcoppell.tx.us> 2/25/03 2:48PM Bethel Road - Revised Additional Fee Request Ken, I got together with Raul Pena and Joe Masterson regarding the 3 additional box culverts. Based on their recollection and a review of the original fee proposal, I do not believe the additional box culverts were part of the original project. As you know, the 60% submittal showed storm drain for the improved roadway and what drained onto the roadway, but no modifications to the existing channel or box culvert on the south side of Bethel. I do not believe the discussions of additional box culverts came up until the drainage report was being finalized. This thought was further reinforced by a statement I read in the original fee proposal which stated "This fee does not include modifications or re-construction of the existing drainage channel south of Bethel Road and in front of the Post Office". However, I have reduced the number of hours for this task so that the additional fee request is under $25,000. The revised request is attached for your review. Please let me know if this is acceptable, or if you have any questions/comments. We are anxious to move forward and complete this project. Thanks. Craig Bond TranSystems 817 -339-8950 cc: <staylor@cLcoppell.tx.us> Pa~~T] February 25, 2003 Mr. Ken Griffin, P.E City of Coppell 255 Parkway Coppell, Texas 75019 Bethel Road - Addendum # I TranSystems Project No. 20000890 RE: Mr. Griffin: Attached IS an additIOnal fee request for additional work associated with revisions to the Bethel Road Project. Revisions to the existing plan set include modifying the roadway width from 27 ft to 25 ft, and the addition of three 5 ft x 10 ft Box Culverts between the east side of the USPS property and Freeport Parkway. Additional work includes channel improvements between Freeport Parkway and Cappel! Road, including box culverts under Bethel Road. We appreciate the opportunity to present this proposal for )'our consideration, Attached please find a spreadsheet with a breakout by task of the hours to perform the work. Below is a summal)' of each task: Dea $3,41000 $6,030.00 $3,41000 $2,220.00 ReviSIOns to Existing Plan Set A.) Storm Drain Plan & Profile 8.) Roadway Plan & Profile C.) Cross Sections D.) Additional Box Culverts (3-5'xlO' $5,00000 $3,610.00 $1 080.00 $24,760.00 Channel Improvements A.) Channel Improvements (Freeport to Coppell Rd 8.) Box Culverts (Bethel Road Crossing) Meetings with City Total The followmg arc assumptions were made to generate the fee. 1. The box culverts at the Bethel Road will be TXDOT direct load boxes, 2 These fees do not include the design of any water and sewer relocations. me if you have any question or require Please review the enclosed informalion and do not hesitate to cal additional information. Sincerely, TranSystems CorporatIOn Jo, Addendum 2-25-03mppe Craig Bond, P.E. Project Manage Data 2M 00890 propos F Ken Griffip - 2-25-03coppell-fee increase. xis Fe~ Increase RequestSrea-KcoWii City of Cappel/ - Bethel Road Page 1 "--~- Plan Revisions/Additions TASK Meetinas wi Citv c =$10ao1l0' TAN T " 8 Storm Drain Plan & Profile 1101 6 40 $ 3410.00 Rd\W Plan & Profiles (141 10 72 $ 6 030.00 Cross Sections 6 40 $3410.00 Additional Boxes f3-S'x10'\ 4 24 $ 2 220.00 Channel {Freenort to Connell Rd.\ 8 56 $ 5 000.00 Bethel Rd. Crossinn 6 40 $ 3 610.00 $ . $- Sub-Total $ 24 760.00 I I I I I I I I J Miscellaneouc: <- TOTAL HOURS 0 48 0 120 0 152 0 0 TOTAL DOLLARS 0- H 4RO 00 0_ OR40000 $- $ 188000 $- $- Proposal for En:.;ineerin:.; Service.,' F'IDnta\200\OOR90\proposal\[coppcll-fccincrcasc.xls]Shcctl Not included are geotechnical services or wetlands mitigation/permitting. T~ Cc::RPC>RATIC>N