Ken,
I got together with Raul Pena and Joe Masterson regarding the 3
additional box culverts. Based on their recollection and a review of the
original fee proposal, I do not believe the additional box culverts were
part of the original project.
As you know, the 60% submittal showed storm drain for the improved
roadway and what drained onto the roadway, but no modifications to the
existing channel or box culvert on the south side of Bethel. I do not
believe the discussions of additional box culverts came up until the
drainage report was being finalized. This thought was further reinforced
by a statement I read in the original fee proposal which stated "This
fee does not include modifications or re-construction of the existing
drainage channel south of Bethel Road and in front of the Post Office".
However, I have reduced the number of hours for this task so that the
additional fee request is under $25,000. The revised request is attached
for your review. Please let me know if this is acceptable, or if you
have any questions/comments. We are anxious to move forward and complete
this project. Thanks.
Craig Bond
TranSystems
817 -339-8950
cc:
<staylor@cLcoppell.tx.us>
Pa~~T]
February 25, 2003
Mr. Ken Griffin, P.E
City of Coppell
255 Parkway
Coppell, Texas 75019
Bethel Road - Addendum # I
TranSystems Project No. 20000890
RE:
Mr. Griffin:
Attached IS an additIOnal fee request for additional work associated with revisions to the Bethel Road
Project. Revisions to the existing plan set include modifying the roadway width from 27 ft to 25 ft, and
the addition of three 5 ft x 10 ft Box Culverts between the east side of the USPS property and Freeport
Parkway. Additional work includes channel improvements between Freeport Parkway and Cappel! Road,
including box culverts under Bethel Road. We appreciate the opportunity to present this proposal for
)'our consideration, Attached please find a spreadsheet with a breakout by task of the hours to perform
the work. Below is a summal)' of each task:
Dea
$3,41000
$6,030.00
$3,41000
$2,220.00
ReviSIOns to Existing Plan Set
A.) Storm Drain Plan & Profile
8.) Roadway Plan & Profile
C.) Cross Sections
D.) Additional Box Culverts (3-5'xlO'
$5,00000
$3,610.00
$1 080.00
$24,760.00
Channel Improvements
A.) Channel Improvements (Freeport to Coppell Rd
8.) Box Culverts (Bethel Road Crossing)
Meetings with City
Total
The followmg arc assumptions were made to generate the fee.
1. The box culverts at the Bethel Road will be TXDOT direct load boxes,
2 These fees do not include the design of any water and sewer relocations.
me if you have any question or require
Please review the enclosed informalion and do not hesitate to cal
additional information.
Sincerely,
TranSystems CorporatIOn
Jo,
Addendum
2-25-03mppe
Craig Bond, P.E.
Project Manage
Data 2M 00890 propos
F
Ken Griffip - 2-25-03coppell-fee increase. xis
Fe~ Increase RequestSrea-KcoWii
City of Cappel/ - Bethel Road
Page 1
"--~-
Plan Revisions/Additions
TASK
Meetinas wi Citv c =$10ao1l0' TAN T "
8
Storm Drain Plan & Profile 1101 6 40 $ 3410.00
Rd\W Plan & Profiles (141 10 72 $ 6 030.00
Cross Sections 6 40 $3410.00
Additional Boxes f3-S'x10'\ 4 24 $ 2 220.00
Channel {Freenort to Connell Rd.\ 8 56 $ 5 000.00
Bethel Rd. Crossinn 6 40 $ 3 610.00
$ .
$-
Sub-Total $ 24 760.00
I I I I I I I I J
Miscellaneouc:
<-
TOTAL HOURS 0 48 0 120 0 152 0 0
TOTAL DOLLARS 0- H 4RO 00 0_ OR40000 $- $ 188000 $- $-
Proposal for En:.;ineerin:.; Service.,'
F'IDnta\200\OOR90\proposal\[coppcll-fccincrcasc.xls]Shcctl
Not included are geotechnical services or wetlands mitigation/permitting.
T~