Loading...
Amberpoint BP 2-CS030314T H E C I T Y O F COPPELL ~ ~~ ~ T p F ~, A S 1 8 9 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Brian Daigle, H' it a on fax: 214-299-4450 From: Larry Davis o t t' n nspector Date: March 14, 2 RE: WALK-THR for Amberpoint Business Park (Staples) A final walk-thru for paving and utilities on the above referenced project has been scheduled for Thursday, March 20, 2003 at 2:00 p.m. If I can be of further assistance, please let me know. cc: Ken Griffin, P.E. City Engineer / Director of Public Works Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshall Jaime Beard, Halff Associates fax: 214-739-0108 Claire Callaham, CalHar Construction, Inc. fax: 972-838-2299 Sonia Dominguez, Potter Concrete, Ltd. fax: 214-689-1066