Loading...
Amberpoint BP 2-CS030325Mar 25 03 02:02p -z~" zd3 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS CITY OF COPPELL DATE: March 25, 2003 TO: Larry Davis, Engineering FROM: Danny Hightower, Utilities RE: Staples / Amberpoint Business Park Walk-thru 1. Valve to north vault: remove dirt from around pad. 2. Mark MLV in blue and FHV in red on curb at second fire hydrant on west side of building. 3. Mark CO in red on west side of building and on curb on east side of building for cleanouts. 4. Repaint all fire hydrants red. 5. Seal invert with no feed on inside of manhole southwest of building. 6. Test irrigation double check and place brass plugs in ball valve on DC #4. 7. Need letter from landscaper: no valves or manholes to be covered and all valves work after landscaper completion. p.l 8. Staples sign by vay~t may be in utility easement. ~1{fter con ~tionb~"pJt~~ ]ist i~pleaSe c~a1I D~ y Hi tow~~a~7 2-515 o~~ck. ~/ ~,7Yu ~~1yy~~~ Mar 24 03 03:11p - n 1 v7r/ Zj Z 7 6 ~ d~ MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Larry Davis, Construction Inspector Engineering From: Cody Wildoner, Streets Division Public Works Date: 3/24/03 ItE: Walk-thru Staples (Amberpoint Business Park) 1. All O.K. C~ ,~,..~r~y~ j-v . ~'pa-~lSl~e9~YY~ /till fr K/il~~~sd~ p.l ee~ ~,5 "~v~~l l'n~~~y z, -'~'~ ~``~d CITY OF COPPELL PUBLIC iVORKS DEPARTMENT