Loading...
Freeport NIP(7.0)-LR0303198908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630=9819 (fax) REPORT OF WATER INJECTION INSPECTION Client: Duke Realty Services, LP Arm: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway C0ppell, TX Services: Water Injection Inspection Report No.: 172887 Project No.: 037333 Date of Service: 03/15/2003 Report Date: 03/19/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative{s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (l) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers 6:30 a.m. - 11:00 a.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. Ron K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD PaRe I of 1 WATER INJECTION OBSERVATION Client: Duke Realty Services, LP Report No.: 172887 Project No.: 037333 Project: Freeport 10 Date of Service: 3/15/2003 500 Freeport Parkway Page 2 of 3 Coppell, TX ' 'DESCRIPTION/EXPLANATION YES NO N/A 1. Specific ~lravity of lime was checked and found to be 1.14 and 1.17 x 2. Lime slurry was continuously/agitated X 3. Surfactant was added to each load x 4. The injection pressure was kept between 50 to 100 psi at point of injection X 5. Intervals of 12" were achieved durin9 iniection process until refusal X 6. Total depth of injection - 10 feet X 7. Max. spacincj of iniection probes was recorded to be 5 ft. X 8. Free lime on sur[ace x 9. Square feet injected on this date 96,500 10. Location of iniection Buildin(j pad 4-D Remarks: continued 2nd pass See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: Technician: 6:30 a.m. - 11:00 a.m. L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. -ouI 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630=9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: Project: Services: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Freeport 10 500 Freeport Parkway Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. Report No.: 172911 Project No.: 037333 Date of Service: 03/16/2003 Report Date: 03/19/2003 PROJECT DATA CONTRACTOR: Duke Realty Services, LP Test Methods: ASTM D-2922 ASTM D-3017 M~D No. Description Gauge: Troxler 3430 Moisture Gauge Serial No: 32720 Current: 655 Test Mode: DT Previous: 651 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Standard Counts Density Current: 3061 Previous: 3045 Project Requirements Moisture Density 1 Dark Brown Clay 19.5 104.5 Optimum +4 95 rain FIELD DENSITY TESTS TEST NO TEST LOCATION PROBE M/D MOISTURE WET DENSIIY DRY DENSITY DENSITY DEPTH No. (%) (PCO (pcf) (% max) Fill 1 Retention pond, 100' east & 25' south of 6" 1 22.1 124.1 101.6 97 northwest comer, 1st lift Fill 2 Retention pond, 150' east & 30' south of 6" 1 23.0 126.8 103.1 99 northwest comer, 1 st lift Fill 3 Retention pond, 225' east & 25' south of 6" 1 22.4 123.6 101.0 97 northwest comer, 1 st lif~ Technician: Larmy Gist Report Distribution: (I) Duke Realty Services, LP (1) Duke Realty Services, LP ( 1 ) City of' Coppell Engineering Dept. (1} Pacheco Koch Consulting Engineers Test results on this report meet project specification. Started: 9:00am Finished: 1 l:00a (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, eppeamnce, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 1 of 1 RoneEn gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) REPORT OF REINFORCING STEEL INSPECTION Client: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Reinforcing Steel Inspection Report No.: 172831 Project No.: 037333 Date of Service: 03/14/2003 Report Date: 03/19/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Reinforcing Steel Inspection. The results are attached. Technician Time: Page 1 of 2 Technician: Lan_ny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers 2:30 p.m. - 3:00 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they am addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Page 1 of 1 RoneEn gineers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 121NorthRayner Fort Worth, Texas 76111 (817)831-6211 Client: Project: Report of Reinforcing Steel Inspection Report No.: Project No.: Date of Service: Page 69~7Y$3 ~L of q.~ Locationsandltemslnspected: //7/¢;q,c~,_~'[~ ~'t~; ~ 7t-Oo2 57~3/rrt Z,/,~ c° ~ Items Inspected: Conforming Non Items Inspected: Conforming Non Items Inspected: Conforming Non Conforming Conforming Conforming Placing Drawings Bar Length Column Ties Properly Approved ~ and Shape ~ Tied and Spaced Bar Size ~ Proper Bar Placement L.---~-- Stirrup Spacing and Type Bar Grade ~ Properly Tied ~ Lapped Splices Bars Clean ~.,~'~ Dowel Bars in Place ~ Welded Splices 'orm Clean ~-~ Proper Bar Supports /~"' Mechanical Splices Number Bars ~ Proper Cover Discrepancies / Comments: Inspector's Signature: ~ -~' )~ ? Time: ~: ~o£~..._ to 3-,o£----- Client/Contractor Signature: Client/Contractor Copied with Results: Yes / No 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630.9745 (214) 630-9819 (fax) REPORT OF WATER INJECTION INSPECTION Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway 'Coppell, TX Services: Water Injection Inspection Report No.: 172718 Project No.: 037333 Date of Service: 03/13/2003 Report Date: 03/19/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: 6:30 a.m. - 5:30 p.m. Page 1 of 3 Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers (I) Engineering Analyst (l) City of Coppell Engineering Dept. K. SCott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pa-e 1 of I WATER INJECTION OBSERVATION Client: Duke Realty Services, LP Report No.: 172718 Project No.: 037333 Project: Freeport 10 Date of Service: 3/13/2003 500 Freeport Parkway Page 2 of 3 Coppell, TX -, ' ' DESCRIPTION/EXPLANATION YES NO N/A 1. Specific gravity of lime was checked and found to be 1.14 and 1.17 X _~. Lime slurry was continuously agitated x i3. Surfactant was added to each load x ~4. The iniection pressure was kept between 50 to 100 psi at point of injection x 5. Intervals of 12" were achieved during iniection process until refusal x 6. Total depth of iniection -- 10 feet X 7. Max. spacing of iniection probes was recorded to be 5 ft. X 8. Free lime on surface X 9. Square feet injected on this date 133,000 10. Location of injection Building pad 4-D Remarks: continued 1st pass See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: Technician: 6:30 a.m. - 5:30 p.m. L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibiiity for variation in quality (composition, appearance, perfon'nance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. +-I-H .... ~4- Ro gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) REPORT OF WATER INJECTION INSPECTION Client: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Water Injection Inspection Report No.: 172784 Project No.: 037333 Date of Service: 03/14/2003 Report Date: 03/19/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (I) Paeheco Koch Consulting Engineers 6:30 a.m. - 12:00 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. Ro n CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD PaRe 1 of 1 WATER INJECTION OBSERVATION Client: Duke Realty Services, LP Report No.: 172784 Project No.: 037333 Project: Freeport 10 Date of Service: 3/14/2003 500 Freeport Parkway Page 2 of 3 Coppell, TX · DESCRIPTION/EXPLANATION YES NO N/A 1. Specific ~Iravit¥ of lime was checked and found to be 1.14 and 1.17 x 2. Lime slurry was continuously agitated X :~. Surfect~nt was added to each load X ~. The injection pressure was kept between 50 to 100 psi at point of iniection x 5. Intervals of 12" were achieved durin~l iniection process until refusal X 5. Total depth of iniection - 10 feet x 7. Max. spacin~l of injection probes was recorded to be 5 ft. x 5. Free lime on surface X 9. Square feet injected on this date 112,000 10. Location of injection Building pad 4-D Remarks: completed 1st pass, began 2nd pass See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: Technician: 6:30 a.m. - 12:00 p.m. L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samPles provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. ~H-H S'~J qBGI-~B~(/.IB) 'ouI ~sJ~,u.~u3 auo2J eO~:80 ~0 BI ~N glneers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: Project: Services: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Freeport 10 500 Freeport Parkway Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. Report No.: 172888 Project No.: 037333 Date of Service: 03/15/2003 Report Date: 03/19/2003 PROJECT DATA CONTRACTOR: Duke Realty Services, LP Test Methods: ASTM D-2922 ASTM D-3017 M/D No. Description Gauge: Troxler 3430 Moisture Gauge Serial No: 32720 Current: 651 Test Mode: DT Previous: 667 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Standard Counts Density Curreat: 3045 Previous: 3079 Project Requirements Moisture Density 1 Dark Brown Clay 19.5 104.5 Optimum +4 95 rain FIELD DENSITY TESTS TEST NO TEST LOCA~ON PROBE M/D MOISTURE WETDENSITY DRYDENSITY DENSITY DEPTH No. (%) ~c0 OeO (% max) Fill 1 Retention pond, west radius, 20' north of 6" 1 22.6 126.0 102.8 98 southwest comer, 1 st lift Fill 2 Retention pond, west radius, 40' north of 6" 1 22.8 126.1 102.7 98 southwest comer, 1st lift Fill 3 Retention pond, west radius, 60' north of 6" 1 22.6 125.4 102.3 98 southwest comer, 1st lift Test results on this report meet project specification. ~./~/~ (1, En~t:ee~:~:~ljli~0a Finished: 12:30p .R~~~r[~ ....... __~ (1) city of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager Technician: Lan_ny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (i) City of Coppell Engineering Dept. (1) Pacheeo Koch Consulting Engineers LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page I of 1 RoneEn glneers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: Project: Services: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Freeport 10 500 Freeport Parkway Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. Report No.: 172785 Project No.: 037333 Date of Service: 03/14/2003 Report Date: 03/19/2003 PROJECT DATA CONTRACTOR: Duke Realty Services, LP Test Methods: ASTM D-2922 ASTM D-3017 M/DNo. Desc~pfion Gauge: Troxler 3430 Moisture Gauge Serial No: 32720 Current: 667 Test Mode: DT Previous: 661 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Standard Counts Density Current: 3079 Previous: 3099 Project Requirements Moisture Density 1 Tan Grayish Brown Clay w/Traces of Sand 21.5 103.5 Optimum +4 95 min FIELD DENSITY TESTS TEST NO TEST LOCATION PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (%) (Pc0 (pcf) (% max) Backfill 1 Storm drain, line 1, Station 3+00, 1st lift 6" 1 22.8 122.1 99.4 96 Backfill 2 Storm drain, line 1, Station 3+50, 2nd lift 6" 1 21.8 125.0 102.6 99 Backfill 3 Storm drain, line 1, Station 4+00, 1st lift 6" 1 22.3 126.1 103.1 100 Backf'fll 4 Storm drain, line 1, Station 4+50, 2nd lift 6" 1 22.7 121.5 99.0 96 Backf'fll 5 Storm drain, line 1, Station 5+00, 1st lift 6" 1 23.2 123.7 100.4 97 Test results on this report meet project specification. Technician: Larmy Gist Started: 12:00p Finished: 2:30pm R/~~~~x~ Report Distribution: (1) Duke Realty Services, LP (1) Engineering Analyst (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) City of Coppell Engineering Dept. CMT Operations Manager (I) Paeheco Koch Consulting Engineers LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for vafiation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Ro/ae Engineers, Ltd. 07DD Page 1 of 1 RoneEngineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: Duke Realty Services, LP ARm Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 172588 Project No.: 037333 Date of Service: 03/11/2003 Report Date: 03/19/2003 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fi'esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Hanson PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 2 Days SLUMP (in): 8" Maximum AIR (%): TEST METHOD: 3% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 7524 PLACEMENT DATE: 03/1 1/2003 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 4:00pm BATCH TIME: 3:00pm TEMPERATURE (F) - AIR 68 F CONCRETE: 62 F TRUCK NO: 648 TICKET NO: 499983 AIR CONTENT (%): 3.5 UNIT WEIGHT (pcO: NA OVERALL PLACEMENT LOCATION: Paving patch at storm line S-I SAMPLE LOCATION: Westbound land REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 4.00 MAXIMUM DATE AGE LOAD TESTED (days) Obs. force) 03/13/2003 2 107050 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3790 Unbonded Cap 1 2 4.00 03/18/2003 7 140805 4980 Unbonded Cap 1 3 4.00 1 4 4.00 04/08/2003 28 04/08/2003 28 Unbonded Cap Unbonded Cap 1 5 4.00 03/15/2003 4 124725 4410 Unbonded Cap Water added at site: 10 gallons Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Potter Concrete Started: 2:30pm Finished: 5:30pm (1) Paeheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DK Page 1 of 1