REPORT OF WATER INJECTION INSPECTION
Client: Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project~ ~
~3'l~reeport Parkway
Coppell, TX
Services: Water Injection Inspection
Report No.: 172021
Project No.: 037333
Date of Service: 03/03/2003
Report Date: 03/10/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Water Injection Inspection. The results are attached.
Technician Time:
Page 1 of 3
Technician: Lanny Gist
Report Distribution:
(I) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Engineering Dept.
(1) Paeheco Koch Consulting Engineers
6:30 a.m. - 4:30 p.m.
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Pa-e I of 1
WATER
INJECTION OBSERVATION
Client: Duke Realty Services, LP Report No.: 172021
Project No.: 037333
Project: Freeport 10 Date of Service: 3/3/2003
500 Freeport Parkway Page 2 of 3
DESCRI PTION/EXPLANATION YES NO N/A
1, Speoific Gravity of lime was checked and found to be 1.'14 and 1.17 N/A
2. Lime slurry was continuously aGitated N/A
3, Surfactant was added to each load X
4. The iniection pressure was kept between 50 to 100 psi a! point of iniection x
§. Intervals of 12" were achieved durinG injection process until refusal X
~. Total depth of iniection -- 10 feet X
7. Max. spacin~l of iniection probes was recorded to be 5 ft. X
~,. Free lime on surface N/A
9. Square feet iniected on this date 97,000
10. Location of injection Building pad 2-B
Remarks: continued 4th pass
See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime
used on this date.
Time:
Technician:
6:30 a.m. -4:30 p.m.
L. Gist
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for
variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we
have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without
the written approval of Rone Engineers, Inc.
II