Loading...
Freeport NIP(7.0)-LR030310RoneEngineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (2.14) 630-9819 (fax) REPORT OF WATER INJECTION INSPECTION Client: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project~ ~ ~3'l~reeport Parkway Coppell, TX Services: Water Injection Inspection Report No.: 172021 Project No.: 037333 Date of Service: 03/03/2003 Report Date: 03/10/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: Lanny Gist Report Distribution: (I) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Paeheco Koch Consulting Engineers 6:30 a.m. - 4:30 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pa-e I of 1 WATER INJECTION OBSERVATION Client: Duke Realty Services, LP Report No.: 172021 Project No.: 037333 Project: Freeport 10 Date of Service: 3/3/2003 500 Freeport Parkway Page 2 of 3 DESCRI PTION/EXPLANATION YES NO N/A 1, Speoific Gravity of lime was checked and found to be 1.'14 and 1.17 N/A 2. Lime slurry was continuously aGitated N/A 3, Surfactant was added to each load X 4. The iniection pressure was kept between 50 to 100 psi a! point of iniection x §. Intervals of 12" were achieved durinG injection process until refusal X ~. Total depth of iniection -- 10 feet X 7. Max. spacin~l of iniection probes was recorded to be 5 ft. X ~,. Free lime on surface N/A 9. Square feet iniected on this date 97,000 10. Location of injection Building pad 2-B Remarks: continued 4th pass See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: Technician: 6:30 a.m. -4:30 p.m. L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. II