Loading...
Freeport NIP(7.0)-LR030317RoneEn gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) MOISTURE DENSITY RELATIONS Client: Project: Services: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 ~rkway Coppell, TX Report No.: 172618 Project No.: 037333 Date of Service: 03/12/2003 Report Date: 03/17/2003 Obtain a sample of material from the.jobsite, bring the sample back to the laboratory and perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Dake Realty Services,LP ]'EST FOR: Leavout Backfill MATERIAL: Tan Sandy Clay CLASSIFICATION: Leavout Backfill TEST MEmOD: ASTM D-698 ASTM D-4318 Method A REPORT OF TEST DATE SAMPLED: 03/12/2003 MATERIAL PREPARATION: Moist RAMMER TYPE: Mechanical SAMPLED BY: Lanny Gist SAMPLE LOCATION: O11 Site Pond MAXIMUM DRY DENSITY, pcf: 11 7.0 OPTIMUM MOISTURE CONTENT, %: LIQUID LIMIT: 20 PLASTIC LIMIT: 12 PLASTICITY INDEX: 8 Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP ( I ) Duke Realty Services, LP {t} City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers MOISTURE DENSITY RELATIONS 121 Zero, air voids curve I . Spec!tic Gravity 266 Dry 119 Density 8 10 12 14 16 18 20 MOISTURE CONTENT (%} ( 1 ) Engineering Analyst (I) Cit5 of Coppell Engineering Dcpt m. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibiliw tbr variation in quality (composition, appearauce, pertbrmance, etc.) or any other featore of similar subject matter provided by persons or conditions over which we [lave no control Our letters and reports are for the exclusive use of the clients to whom they are addressed aud shall not be reprodnced except m foil without thc wrinen approval of Rone Engiueers. Ltd Page I of 1 RoneEng neers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) REPORT OF WATER INJECTION INSPECTION CHent: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Water Injection Inspection Report No.: 172613 Project No.: 037333 Date of Service: 03/12/2003 Report Date: 03/17/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: Larmy Gist Report Distribution: (1) Duke Realty Services. LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers 6:30 a.m. - 4:30 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our leners and reports are for the exclusive use oft. he clients to whom they am addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pa~e 1 of 1 WATER INJECTION OBSERVATION Client: Duke Realty Services, LP Report No.: 172613 Project No.: 037333 Project: Freeport 10 Date of Service: 3/12/2003 500 Freeport Parkway Page 2 of 3 . DESCRIPTION/EXPLANATION YES NO N/A 1. Specific ~lravib/of lime was checked and found to be 1.14 and 1.17 X 2. Lime slurry was continuously agitated x 3. Surfactant was added to each load X 4. The iniection pressure was kept between 50 to 100 psi at point of iniection X 5. Intervals of 12" were achieved during injection process until refusal X 5. Total depth of iniection -- 10 feet X 7. Max. spacincj of injection probes was recorded to be 5 ft. X 9. Free lime on surface X ~). Square feet iniected on this date 57,000 10. Location of injection Building pad 4-D Remarks: Began 1st pass See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: 6:30 a.m. - 4:30 p.m. Technician: L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, perforn~ance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reporls are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. -Il '-gPPELL ~)A D