Loading...
Gateway BP(1.4)-CS03031703/17/03 MON 08:57 FAX 214 361 5573 HALFF ASSOC INC 111 Halff Associates ENGINEERS ARCHITECTS SCIENTISTS PLANNERS• SURVEYORS March 17, 2003 AVO# 19266 Mr. Rich Kretsch John Burns Construction 655 E. Main Street Lewisville, Texas 75067 RE: Gateway Business Park, Lot 1R, Lot 2R Lot 3 Haverty's Drainage Improvements Exchange Circle Reconstruction Dear Mr. Kretsch: Below is a list of the items that were discussed at the final walk through with the City of Coppell on Thursday, March 13, 2003. Please address each of the items and contact the City of Coppell at (972) 462 -0022. 1. Paint the letters "MH" on the curb on Freeport Parkway adjacent to the two sanitary sewer manholes. The paint shall be enamel and red in color. 2. Paint the tops of each of the sanitary sewer manholes with paint as described in item 1. 3. Clean mud out of storm manhole on Line `B' at station 1 +24. 4. Repair damaged wingwall at Line `B' station 7 +83 with nonshrink grout. 5. Grind off metal remaining from forms in wye inlet at Line `B' station 6 +43. 6. Repair erosion around wye inlet at Line `B' station 6+43. 7. Grass near headwall on Line `B' appeared to only be coming up on one slope. Make sure that grass is established on all disturbed areas. 8. Patch surface cracks on storm manholes with nonshrink grout. 9. Repair silt fence along Freeport Parkway so that loose material does not interfere with traffic. If you have any questions or need additional information please contact me at (214) 346- 6249. HALFF ASSOCIATES, INC. Marty S. Paris, P.E. Project Manager cc: Robert McCann, Catellus Development Group Larry Davis, City of Coppell Preston Stokes, Haverty's Furniture Company DALLAS FORT WORTH HOUSTON McALLEN TRANSPORTATION WATER RESOURCES LAND DEVELOPMENT MUNICIPAL ENVIRONMENTAL STRUCTURAL MECHANICAL ELECTRICAL SURVEYING GEOGRAPHIC INFORMATION SYSTEMS ARCHITECTURE LANDSCAPE ARCHITECTURE PLANNING Z 002 8616 NORTHWEST PLAZA DRIVI DALLAS, TEXAS 7522 (214) 346.6201 FAX (214) 739 -0091