St Joseph-CN030312~ `~
CITY OF COPPELL ~!
CHANGE OR EXTRA WORK ORDER ~ `~
PROJECT: ST. JOSEPH'S VILLAGE
CONTRACTOR: ST. JOSEPH'S VILLAGE, INC.
OWNER: City of Coppell
CHANGE ORDER NO.: TWO (2) DATE: 3/12/03
Description Total
ADD: Starleaf Improvements:
1. Demo Existing Sidewalk $195
2. Install New Sidewalk to match existing $225
3. Administrative Fees $67
Total Revision to Contract Amount $4g7
Previous contract amount $690,132
Net increase in contract amount
~ 487
Revised contract amount $690,619
The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full
accord and satisfaction of all past and future liability originating under any clause in the Contract by
reason of this revision to the Contract.
r 3 • l2.3
City Engineer Date
3/303
Agreed to b Contractor Date
~~-°~ <rJ °%~~
A~~pted by Owner Date
03/11/2003 08:54
9724711499
CENTEX ST. JOSEPH
CENTEX
March 11, 2003
CONSTRUCTION COMPANY
1201 b Sandy Luke Road
Coppell, Tcxav 75019
Mr. Garreth Campbell
The Cit}• of Coppell );agineenng
25~ Parkway Blvd.
Coppell, TX 75019
RE: St. 7oseph Village
SLJBJ: Proposal # 1061
Demo Existing Sidewalk & Replace Sidewalk at South End to tie into existing.
Dear Mr_ Campbell:
PAGE 01/04
We are submitting, herewitL, our Request for Change Order (Proposal) # 1061 in the amount of Four T•Tundred
Eighty Seven Dollazs ($4S7) to provide for Demolition of Existing Sidewalk & Installation of new Sidewalk at
South End of Star Leaf Road to tie into existing. Please notify Centex of your acceptance of this proposal as soon as
possible.
This proposal covers only the changes to the specific work as set forth in the attached Proposal breakout. Changes in
the work and associated price adjustments other than those noted in our Proposal are not included.
Please execute the attached Approval Form and return to us as soou as possible. Should them be any questiors
pertaitdng to this Proposal, please feel free to reach us the job-site office.
Sin e y,
V/
Ryan Robe s
Asst. Project Manager
T A.S RCO #23 dated 03/07/03
`_
~lJe lrv,~ -I~ ~~- s ~r
3. , Z-o 3
VLIY 1 LT ~ 1 JUUtYH
CENTEX
C®NSTRUCTION CQMI~'ANY
Proposal Recap
PAGE e2iea
Proposal Number 1061
Owner's Reference Number PR-1061
Description Demo Existing Sidewalk & Replace Sidewalk at South End bo Yie into existing.
General Contractor -Direct Costs $D.00 $0.00 $0.00 $0.00
rYw p„ irl II , ~)LN n w ~ ~ '~I > ~:• RY Y Y ~ I -~ r r'.•' i I i•iM Ylr I 'J r qo IW I
G~~~tiAccount+' 1' ~' ~(i',! ~ ~~'pig!~Des~Crip~l;an~li~~~"(i~,lya %^ , ~'^!TI ~"~ ~~Yr~lil;'i'~ ~,, iSubcorttk~;~tor~,R', ~';!f. , . ^ ~ `'t ~ 'I ;+To~ati~,'~;R~
-- ". x W.... ~,...„ .....M J....J. k~. 1 a. l
027510-5 Concrete Paving and Walks T.A.S. Commeraal Concrete Construction $420.00
Subcontracting Subtotal... $420.00
~ i 117IIi 10 °` T I 14 ii 1 AI ~•1 Vir're lli rl .., i ir,• ii r i 1 I' ~'tl ~ ~ ~~ ~lTDtah '., ~,.Y~~
~ ii 1 ~'I "~ IL. Il~~'iili !' !, I~~,it)~ ftl ~d ~~ 1 I~lili{~~': L rr ~i '! a ,~ t {~,~,~i~li,i~ ~I ~Ily,y~ 1 Cd ~i 1 ~I~ltl,; t`B~IS, ';: ~~I 'i'i~ ~ 1, i, h~
ti II !I,~~.Ill ~.~..1_,1::.,~. ~ '! Q. ~ C4,~.. ~ 1 yl.~i i.~«.~ ~~JJ,.,14!':r.1_ i~t~l Ld i r• ~....a.._.~...__ ~ ...:4
196600 A Genera! Liability 0.791 $420.00 $3.00
196100 A Subguard 1.1 $420.00 $5.00
~ 95000 A Builders Risk G.005 $420.00 $0.00
191000 Overhead 10 $420.00 $42.00
Overhead Subtotal... $50.00
! 4 1 11
' {~'~`~.~~W..:i:.-.~._...~.....r.w.... •~` FB~,. 6.'_..~~~'ulililll'i!1'." ~.:Y^._ ~1~' ~~-.~;^~ii ~iel~i`%~i 1 nW ~~_..rg8$IS~.: ~ Iii11~~,~TOtdJh ~~i~ ~'ji
001955 A IT 0.35 $470.00 $2.00
001772 A Safety 0.3 $470.00 $1.00
999990 C Change Order Fee 3 $470.00 $14.00
Fees Subtotal...
$17.00
PROPOSAL GRAND TOTAL.., 5487.00
__. __. _,,,,,, ,,,,,,,~ ~,~..,li.,» l;tNltx ST. JOSEPH PUGE 63104
St. Joseph Village
PROPOSA)r # 1061
+Y+++rt++++++f+w+++*++++++rts+#wsw***3•r+++r+k++rtsrtx+++s***+•+++++h+»+w*+*++rt+x•+k :tYf+x+*~k*+*+++#+
The following additional work completed by Centex Construction Companyis hereby approved:
Costs:
The total Cost to perform the work as described above is an ADD oFxour Hundred Eighty Seven Aollars ($487}.
Please indicate youz acceptance and approval of this additional work in the space provided below
C
Reviewed by lrre}~eet: Date:
Autlwrization Crranted bye
Date:
Proposal # 1061 Filc
__._, v,__,.._ „ ~t+vitn 5i. JUStYH PAGE 84104
SEN1 s7"ETAS CUNSTRUCT1on 1NC. 3-10- 3 ~ ~-54PM T.a.S. CO>rSTRUCT1on~ s72a'11499.~ li i
Fax Transmittal
To~ Canbx Constryctlon Company Date' 03,~g7/p3
120t E. Sandy Lake Road
CoppeU, TX. 75019
Attn: Ryan R. / PnlhOny t..
Phase 972 471.444
Fax: 972 471-1499
Project; St. Joseph Vdlflge
TAS #~ 20163
Subject: RCO ii23 Request For Change Order
Domo d Replace Sidewalk at South End
of 3hr Leaf
7A5 Commercal GOncret0 Constructon, t. P. is pleased to submit tho following cost proposal.
The proposed cost break down is as follows.
Item Equip.
Phase No. Description Quantity Unit Labor Material Svb Total
2300 1 Demo Existing Sidewalk 60.00 sf $0.00 50.D0 $195.00 5195.1N1
2J00 2 tnstatl New Sltleh'alk to Match Existing 109.00 5f $156.00 $67.00 SO.00 5225.00
Total Sd20.00
Quallfica!ions: Nona
ExGusiors Non«
Fleece issue a Change Order at your aarGe61 convenience.
Sincerely,
TAS Commercial Concreto Construction, L•P.
J Y P
Projotl Manager
cc File 20163
Red Flannagan
,l:~ck Clapp
RGO iop3mDJ