St Joseph-LR030114REPORT OF SOIL-LIME MIXTURE PULVERIZATION
'll'erracan
Consulting E~tglneers & Scientists
8901 Carpenter Frv~., Suite #100
Dallas. Texas 75247
Date of Service:
Client No.:
Client:
01/14/03
70255
St Joseph Village, Inc.
13223 Glad Acres Dr.
Dallas, TX 75234
Report No.:
Project No.:
Project:
Page No.:
94021187.0209
94021187
St. Joseph Village
1201 East Sandy Lake Rd
Coppell, TX
1 ofl
Contractor:
Test Location:
Temporary Apron at N entrance to
project from Sandy Lake Rd.
Test Method: NTCOG
Specification Requirements:
Minimum Passing 1 314" Sieve: 100%
Minimum Passing ff.4 Sieve: 60%
Sample Condition: Field Moist
TEST LOCATION 1-314" SIEVE tlr4 SIEVE
NO. % PASSING % PASSING
1 20' N of Sandy Lake Rd, 18' E of W end of Apron 100 62
2 9' N of Sandy Lake Rd, 28' W of E end of Apron 100 60
Technician: R. Montgomery
Report Distribution:
(1) St Joseph Village, inc.
(1) Centex/Jobsite
(1) City of Coppell - Bldg. Insp.
(1) City of Coppell Engineering
309
(1) St Andrews Management Services
(1) St Andrews Management Services
(1) Aguirre Corporation
This report is exclusively for the u~e of the client indicated above and shall not b~ reproduced in full w/thout written approval of HBC/Terracon.