Loading...
Trinity Shores-LR020927 GEOSCIENCE ENGINEERING & TESTING, INC. GEOTECHNICAL & MATERIALS ENGINEERS COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Ken-Ran Development 2125 N. Josey Lane, Suite 202 Carro[[ton, Texas 75006 DATE OF SERVICE: 09~27/02 PROJECT: Proposed 'q'rinity Shore Estates" Sandy Lake Road Coppel[, Texas REPORT NO. 02-DM857-31a CONTRACTOR: TICKET NO.: 13604868 AMBIENT TEMP. (°F): 98° CONCRETE TEMP. (oF): 80° TIME BATCHED: 10:58 am TIME SAMPLED: 11:50 am WEATHER CONDITION: Hot/Sunny Trinity Court LOCATION OF PLACEMENT: Cares, Courtney E Roebuck, LLC CONCRETE SUPPLIER: BeaLI PLANT/TRUCK: 13/206 MIX ID NUMBER: 3,000 psi WATER ADDED (sat): 5 SLUMP (inches) (ASTM C-143) 5 CYLINDER AGE DATE TOTAL COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED LOAD (lbs) STRENGTH (psi) STRENGTH (psi) 17 7 09/06/02 97,400 3,445 3,0OO/28 Days 18 28 09/27/02 119,750 4,235 19 28 09/27/02 120,400 4,258 20 Hold Specifications: Making Et Curing: ASTM C-143 Testing Methods: ASTM C-143, ASTM C-39 GE'TI Technician: Joe Reviewed by: Project E)ql~peer~ ~ GEOSCIENCE ENGINEERING & TESTING, INC. GEOTECHNICAL & MATERIALS ENGINEERS CLIENT: PROJECT: COMPRESSIVE STRENGTH OF CONCRETE REPORT Ken-Ran Development 2125 N. Josey Lane, Suite 202 Carrol[ton, Texas 75006 DATE OF SERVICE: 09/27/02 Proposed 'q'dnityShore Estates" Sandy Lake Road Coppe[l, Texas REPORT NO. 02-DM857-31b CONTRACTOR: TICKET NO.: 13604885 AMBIENT TEMP. (oF): 99° CONCRETE TEMP. (°F): 87° TIME BATCHED: 1:15 pm TIME SAMPLED: 2:45 pm WEATHER CONDITION: Hot/Sunny Cates, Courtney E Roebuck, LLC CONCRETE SUPPLIER: Beat[ PLANT/TRUCK: 13/190 MIX ID NUMBER: 3,000 psi WATER ADDED (gal): 10 SLUMP (inches) (ASTM C-143) 5 LOCATION OF PLACEMENT: Trinity Court CYLINDER AGE DATE TOTAL COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED LOAD (lbs) STRENGTH (psi) STRENGTH (psi) 21 7 09/06/02 95,650 3,383 3,000/28 Days 22 28 09/27/02 124,750 4,412 23 28 09/27/02 126,300 4,467 24 Hold Specifications: Making E Cudn§: ASTM C-143 Testing Methods: ASTM O143, ASTM C-39 GETI Technician: Joe Reviewed by: Syed S. Afsl~_/~ I~.E~ Project E'llgineer.~_J GEOSCIE, NCE ENGINEERING & TESTING, INC. GEOTECHNICAL & MATERIALS ENGINEERS CLIENT: PROJECT: COMPRESSIVE STRENGTH OF CONCRETE REPORT Ken-Ran Devetopment 2125 N. Josey Lane, Suite 202 CarroUton, Texas 75006 DATE OF SERVICE: 09/27/02 Proposed '~HnityShore Estates" Sandy Lake Road Copper[, Texas REPORT NO. 02-DM857-31c CONTRACTOR: TICKET NO.: 89014813 AMBIENT TEMP. (°F): 99° CONCRETE TEMP. (oF): 89° TIME BATCHED: 2:5g pm TIME SAMPLED: 3:40 pm WEATHER CONDITION: Hot/Sunny Cares, Courtney E Roebuck, LLC CONCRETE SUPPLIER: Beat[ PLANT/TRUCK: 89/126 MIX ID NUMBER: 3,OOO psi WATER ADDED SLUMP (inches) (ASTM C-143) LOCATION OF PLACEMENT: Trinity Court CYLINDER AGE DATE TOTAL COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED LOAD (lbs) STRENGTH (psi) STRENGTH (psi) 25 7 09/06/02 89,900 3,180 3,000/28 Days 26 28 09/27/02 123,600 4,372 27 28 09/27/02 122,750 4,342 28 Hotd Specifications: Makin~ Et Curing: ASTM C-143 Testing Methods: ASTM C-143, ASTM C-39 GETI Technician: Joe Reviewed by: Syed S. Afsar, P.~.\ \ ~ Project Engine~ar ~