Loading...
Trinity Shores-LR020823GEOTECHNICAL & MATERIALS ENGINEERING MECHANICAL STABILIZATION/MODIFICATION FINAL MIX CLIENT: Ken-Ran Development 2125 N. Josey Lane, Suite 202 Carrollton, Texas 75006 PROJECT: Proposed '~frinity Shore Estates" Sandy Lake Road Coppell, Texas Area of Work: Trinity Court DATE OF SERVICE: 08/23/02 REPORT NO. 02-DM857-25 Date lime initially applied: 08/19/02 Average final compacted depth: 6 inches Date of final mixing: 08/23/902 Sample Location: 100' S from Sandy Lake Rd 100 300' S from Sandy Lake Rd 100 Center of Cul-de-Sac 100 % Passing 1 ~A Sieve % Passinq No. 4 Sieve 64% 66% 63% Remarks Passed Passed Passed Specifications: 1 ~ S~eve: 100% passin~ 4 Sieve: 60% passing Reviewed by: GETI 2630 Northaven Road Suite 106 Dallas, Texas 75229 Ph~ (972) 488-35OO