Site Concrete, Inc.
Jean S. Boney, President
3340 Roy Orr
Grand Prairie, TX 75050
RE: MacArthur / Samuel Drainage Project #DR 00 -01
Dear Ms. Boney:
A preconstruction conference on the referenced project has been scheduled for Tuesday, April 1,
2003 at 2:00 p.m. in the second floor conference room at Town Center, 255 Parkway Blvd.,
Coppell, Texas.
If you have any questions concerning this project prior to the scheduled meeting, feel free to contact
me at 972/304 -7090.
Sincerely,
I dc-� S
Rick O'Dell
Construction Inspector
Office 972/304 -7090
Fax 972/304 -3570
cc: Ken Griffin, Dir. of Engineering/Public Works
Suzan Taylor, CIP Coordinator
Garreth Campbell, Inspector
Larry Davis, Inspector
Jim Phillips, Oncor 214/875 -2266
David Frey, Verizon Communications Fax 972/t3 31 $ - Sa? p
255 PARKWAY * P.O BOX 478 # COPPELL TX 75019 * TEL 972/462 0022 * FAX 9721304 3673