Loading...
DR0001-CS030326T H E C I T Y O F COFFE Cj X A S l a March 26, 2003 Site Concrete, Inc. Jean S. Boney, President 3340 Roy Orr Grand Prairie, TX 75050 RE: MacArthur / Samuel Drainage Project #DR 00 -01 Dear Ms. Boney: A preconstruction conference on the referenced project has been scheduled for Tuesday, April 1, 2003 at 2:00 p.m. in the second floor conference room at Town Center, 255 Parkway Blvd., Coppell, Texas. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at 972/304 -7090. Sincerely, I dc-� S Rick O'Dell Construction Inspector Office 972/304 -7090 Fax 972/304 -3570 cc: Ken Griffin, Dir. of Engineering/Public Works Suzan Taylor, CIP Coordinator Garreth Campbell, Inspector Larry Davis, Inspector Jim Phillips, Oncor 214/875 -2266 David Frey, Verizon Communications Fax 972/t3 31 $ - Sa? p 255 PARKWAY * P.O BOX 478 # COPPELL TX 75019 * TEL 972/462 0022 * FAX 9721304 3673