Loading...
DR0001-CS030401 (2)T H E C 1 T Y O F COPPELL X A R _ 5 April 1, 2003 Ms. Allison Chenault TERRA -MAR 11050 Ables Lane Dallas, Texas 75229 RE: MacArthur / Samuel Drainage Project DR 00 -01 Dear Ms. Chenault: Attached are the plans and specifications for the above referenced project. The project consists of the installation of approximately 978 linear feet of storm sewer pipe and five inlets near the intersection of MacArthur and Samuel Boulevards. The City also uses the Standard Specifications for Public Works Construction — North Central Texas latest addition as prepared by the NCTCOG. Please submit a proposal with a list of anticipated testing charges based on the plans and specifications. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please advise. Sincerely, � v� TCt; jl� Suz Taylor CIP ordinator Enclosures 255 PARKWAY * P. O.BOX 476 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673