Loading...
PA9702-LR 990820CONCRETE COMPR SIVE STRENGTH Sg01 Carpenter Frwy~ Suite #109 D2tl~% Texas 75247 Date of Service: 07/30/1999 Report No.: 9920684 Report Date 08/20/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppoll Project: Coppoll Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppcll TX 75019 Coppoll, Texas/Prj. 4~)6051 Services: Obtain samples ~f fresh c~ncrete at the p~acement ~ocati~ns~ pe~~rm r~quired ~e~d test and cast compressivc strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCP~3~ CLASS: N/A CONCRETE SUPPLIER: Nelson pLACEMENT DATE: 07/30/1999 BATCH TIME: 3:52am PLANT: 2 TI]~E SAMPLED: 4:25am BY: lack Farris SPECIFICATION REQUIREMENTS WEATHER CONDrrlONS: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATCn~ (g) - AIR 79 F CONCm~'r~: 90 F SLUMP: 4-6" TRUCK NO: 211 TICKET NO: N/A Am: N/A AmCO~,~r~NT(~): N/A UNITWEIGHT(per): N[A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Slab-on*grade gym building ASTM C- 172 ASTM C-39 (see attached sketch) SAMPLE LOCATION: See below REPORT OF TESTS ACCV n LA VEyAnOS: 40 CYLINDER MEASURED MAXIMUM COMPRESSlYE MARKED SLU~IP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 1 1 5.50 08/0~/1999 7 121750 43 10 1 2 5.50 08/06/1999 7 115320 4080 Average 4:200 1 3 5.50 08/27/1999 28 1 4 5.50 08127/1999 28 Sarap3. e ~.ocatj_en: From northwest: corner 2 £eet south and 3 £eet: eas~: Concret:e p~_aced by pump, samplot1 a~: poj. nt; of cl5_scharge. This ripoft is exclusively for dic use of die client indicated above and shall not be reproduced except in full witbout die written approval of HBC Engineering, Inc. 0ILL Page 1 of 2 CONCRETE COMPlk SSIVE STRENGTH 8901 Carp~nt¢~ Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/30/1999 Report No.: 9920684 Report Date 08/20/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. ~96051 Services: ~btainsamp~es~ffreshc~ncreteatthep~acement~ocati~ns~pe~~rmrequired~e~dtestandcast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson PLACEMENT DATE: 07/30/1999 BATCH TIME: 5:10am PLANT: 2 TIME SAMPLED: 6:00alll BY: Jack Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMPEnATURE (F) - AIR 80 F CONCRETE: 90 F SLUMP: 4-6" TRUCK NO: 221 TICKET NO: N/A AIR: N/A AIRCONTENT(%): N/A UNIT WEIGHT (~r}: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 130 CYLINDER MEASURED MAXIMIJM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) 0bs- force) (psi) TYPE 2 1 4.75 08/06/1999 7 132400 4680 2 2 4.75 08/06/1999 7 127580 4510 Average 4600 2 3 4.75 08/27/1999 28 2 4 4.75 08/27/1999 , 28 Sample location: Form southeast corner 4 feet north and 5 feet west Sampled at point of discharge. Technician: Jack Farris Started: 3:00am Finished: 6:30am Report Distribution: gineering, Inc. (1) City of Coppell (1) City ofCoppell - Engineering (1) Brinldey Sargent Architects (1) City ofCoppell - Bldg. Insp. Eugene Harbour (1) Turner Engineers (1) City of Coppell - Leisure Serv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 2 'l I T !