Loading...
Freeport NIP(7.0)-LR030328 gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 63O-9745 (214) 63O-9819 (fax) REPORT OF WATER INJECTION INSPECTION CHeat: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway C0ppell, TX Services: Water Injection Inspection Report No.: 173538 Project No.: 037333 Date of Service: 03/26/2003 Report Date: 03/28/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (I) Duke Realty Services, LP (l) City of Copp¢ll Engineering Dept. (1) Paeheco Koch Consulting Engincem 2:00 p.m. - 4:30 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports am for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pa.e 1 of 1 WATER INJECTION OBSERVATION Client: Duke Realty Services, LP Report No.: 173538 Project No.: 037333 Project: Freeport 10 Date of Service: 3/26/2003 500 Freeport Parkway Page 2 of 3 Coppell, TX · 'DESCRIPTION/EXPLANATION YES NO N/A · Specific gravity of lime was checked and found to be 1.14 and 1.17 X 2. Lime slurry was continuously a~itated X 3. Surfactant was added to each load X ~,. The injection pressure was kept between 50 to 100 psi at point of iniection X 5. Intervals of 12" were achieved during injection process until refusal X 16. Total depth of iniection -- 10 feet X 7. Max. spacincg of iniection probes was recorded to be 5 ft. X 8. Free lime on surface X 9. Square feet iniected on this date 136,000 10. Location of injection Building pad 5-E Remarks: continued 2nd pass See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: 2:00 p.m. - 4:30 p.m. Technician: L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. RoneEn gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: Project: Services: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Freeport 10 500 Freeport Parkway Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. Report No.: 173540 Project No.: 037333 Date of Service: 03/26/2003 Report Date: 03/28/2003 PROJECT DATA CONTRACTOR: Duke Realty Services, LP Test Methods: ASTM D-2922 ASTM D-3017 Standard Counts Density Current: 3079 Previous: 3065 Gauge: Troxler 3430 Moisture Gauge Serial No: 32720 Current: 669 Test Mode: DT Previous: 657 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Dark Brown Clay 18.0 106.5 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE NO TESTLOCATION DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) ~c0 (pco (% ma~ Utility Backfill 1 Sanitary sewer, Line 1, Station 0+75, 5' 6" 1 21.1 122.8 101.4 95 below Utility Backfill 2 Sanitary sewer, Line 1, Station 1+50, 3' 6" 1 20.3 123.5 102.7 96 below Utility Backfill 3 Sanitary sewer, Line 1, Station 2+50, I' 6" 1 21.8 125.3 102.9 97 below Utility Backfffi 4 Sanitary sewer, Line 1, Station 3+50, 1' 6" 1 21.9 126.3 103.6 97 below Utility Backfill 5 Sanitary sewer, Line 1, Station 0+50, 3' 6" 1 19.6 127.1 106.3 100 below LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Eng/neers, Ltd. 07DD Page 1 of 2 Report No.: 173540 RoneEngineers Project No.: 037333 mmmm~l Client: Duke Realty Services, LP TEST NO TEST LOCATION PROBE DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (pc0 (% max) Utility Backf'fll 6 Sanitary sewer, Line 1, Station 1+25, 1' below Utility Backfffi 7 Sanitary sewer, Line 1, Station 0+50, 1' below Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (l) City of CoppelI Engineering Dept. (1) Pacheco Koch Consulting Engineers 6" 1 19.3 127.8 107.1 101 6" 1 20.7 127.1 105.3 99 Test results on this report meet project specification. ta.e : 1 .oop ini.he 2:00 m (I) Engin~ng ~alyst (1) CiW ofCoppell En~neafing Dept. ~ K. Sco~ ~atson CMT ~erations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 2 of 2 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: Project: Services: Duke Realty Services, LP Arm: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Freeport 10 500 Freeport Parkway Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. Report No.: 173376 Project No.: 037333 Date of Service: 03/25/2003 Report Date: 03/28/2003 PROJECT DATA CONTRACTOR: Duke Realty Services, LP Test Methods: ASTM D-2922 ASTM D-3017 M/D Nu. Description Gauge: Troxler 3430 Moisture Gauge Serial No: 32720 Current: 657 Test Mode: DT Previous: 665 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf 1 Dark Browb Clay (lime treated) 20.0 101.0 Standard Counts Density Current: 3065 Previous: 3083 Project Requirements Moisture Density Optimum + 95-100 FIEI,D DENSITY TESTS TEST NO TEST LOCATION Lime Subgrade 1 Building pad, 50' south x 20' east of northwest comer, final Lime Subgrade 2 Building pad 150' south x 25' east of northwest comer, final Lime Subgrade 3 Building pad 250' south x 25' east of northwest comer, final Lime Subgrade 4 Building pad 350' south x 25' east of northwest comer, final Lime Subgrade 5 Building pad 450' south x 75' east of northwest comer, final PROBE DEPTH MID MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (per) (per) (% max) 6" 1 23.0 122.8 99.8 99 6" 1 23.2 121.0 98.2 97 6" 1 22.6 123.3 100.6 100 6" 1 21.6 120.4 99.0 98 6" 1 23.7 124.8 100.9 100 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Oar letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 1 of 2 Report No.: 173376 Project No.: 037333 Client: Duke Realty Services, LP RoneEngineers TEST NO TEST LOCATION Lime Subgrade 6 Building pad 350' south x 75' east of northwest comer, fmai Lime Subgrade 7 Building pad 250' south x 75' east of northwest comer, £mal Lime Subgrade 8 Building pad 150' south x 75' east of northwest comer, final Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (I) City of Coppell Engineering Dept. (1) Paeheco Koch Consulting Engineers PROBE DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pcf) (Pc0 (% max) a- 1 6" 1 6" 1 24.7 123.2 98.8 98 22.5 122.7 100.2 99 21.4 120.7 99.4 98 Test results on this report meet project specification. Started: 6:30am Finished: 9:00am (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, eppeamnce, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 2 of 2