Loading...
Gateway BP(1.4)-CS 970417ENGINEERING DEPARTMENT FAX COVER SHEET The City With A Beautiful Future TO: Pe_S`c-mil \zQS FIRM: y`— y FAX NO: 4 4 '10 9458 TRANSMITTED BY NUMBER OF PAGES (INCLUDING COVER SHEET) (u1-o IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (972) 304 -3679. P.O. BOX 478 255 PARKWAY BLVD. COPPELL, TX 75019 FAX NO. (972) 304 -3570 FROM C- zi pve±kQANn06e lL PHONE NO 9 Z 1 0 4 I 362&5 DATE. V tc\c\1 TIME REMARKS 5 40 ,2 JQS lie 7o4Ar i■. -0mtc0 cso`D I �ve rvv -vas ems( (D o �ro 3o 3D8S EXCELLENCE BY DESIGN 08/05/03 TUE 13:41 FAX 4044134176 HAVERTY FUR: 0 12s4e CITY OF 'PELL ENGINEERINS 4 404 $70 9456 �a. rr6 'tea' 04/2 Page 9 based our scientific. engineering, and economic Considerations. This ordinance does not imply that erosion and sedimentation controls will survive inundation rols by runoff free storms or t1USt land below such controls will be free from flooding or flood damages• ordinance shall not c r e at e lia ilit h tllexetfo f for of Coppell, or any employee any flood daemons• or erosion or sedimentation damages. whether to persons or property, that result from reliance on this ordinance or any administrative decision lawfully made thereunder. F_ SCUTT FOR P*? BROSIOM COMMA 111 NSW SUBDIV1S1C1iS The applicant shall provid w�w1 in the farm of .t.,as.Rt, certificate of •si. r irrevocable 1lLstei o cwt acceptable to Y sure that ViatStive cover and other permanent .arosioa control asiasurao are installed, maintained, and tunctiouing properly up to a two (21 year period from the data of flail acceptance or the aaeica BQ streets and /ax utilities by the City of Coppell- This surety shall be given to the City before the final acceptance of the streets and/or utilities. This surety shall be in the ameont estimated by the Oevelops vnich s 100 percent of the coat of coestna nta a a permanent erosion entrees for a two -year period- dorever. such estimate m De s ub j ect to review by the City Engineer rejected. and the surety not accepted. of teasonCbty EAgineer deems the estimate not to be a approximation of the coats of constructing and maintaining the erosiea controls. Should the vegetative cover die or become sparse or the erosion controls Pail to be maintained or arc net functioning during this two -yes: period, the City may notify applicant is writing. The applicant has ton (10) days alter being notified to begin correcting the may problems- if no corrections are started, the C or Oahe the necessary repairs by ta billing the applicant. If at the and of the two ■ear period the vegetative cover le still not established or is sparse. or the erasion controls era not f4nctionin9, the City may exercise the surety and bane the erosion controls installed abd1 establtabed. The above procedures for ansaring that vegetation is established snail apply to all projects, whether or not the vegetative is the lva9 -term maintenance reeponeibility of the City. hey vegetative cover which is planted and is a permanent part of the impreeseent project will not be accepted by the City until the growth has been established