Loading...
DR9601-LR 970130HENLEY JOHNSTON & ASSOCIATES, INC. engineeri-~g geoscienc8 consu~aqts DALLY FIELD REP PROJECT: HAVER .'FY'S DISTRIBUTION CEN~ER PROJECT No: CLIENT: HAVERTY'S FURNITURE CO. REPORT DATE: ./- 3¢ HJA JOB No: 6641 TECHNICIAN: ~ RE-VIEWED BY: BRIEF DESCRIPTION AND LOCATION: WEATHER: D/~ ~,~, ~ ° TIME: START WORK: /~,"t ~ ~ STOP WORK: ,, DE~,YS: ' /2. /S'" ~.~ WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECT]( CHECK(X)APPROPRiATERESPONSE_ASTERiSK(.)REPONSE EQUIR~_SCC R ~ 1. PIER INSPECTION / FOUNDATION 2. CONCRETE INSPECTION 3. SUB-SURFACE DRAIN INSTALLATION 4. SELECT FILL PLACEMENT 5. LIME STABILIZATION 6. FOOTING INSPECTION 7. GENERAL INSPECTION * 8. REINFORCEMENT STEEL INSPECTION 9. TIE-BACK INSPECTION REMARKS: ~0. FIELD DENSITY TESTING 11. CONCRETE CYLINDER / PIC~ 12. GROUT CUBES 13. FIELD GRADATION / LIME 14. FIELD REPORTS ) ) ( ) ( ) 15. FIELD SAMPLING 16. TENDON / PROOF LOAD INSF 17. PIER INSPECTION / RETENTI¢ 18. SEE ATTACHED SHEETS FOR TEST RESULTS TECHNICIAN: ENGINEER; REPORT No.: SHEET / OF _~ telephone (214) 941-3808 fax (214) 943-7645 235 Morga~ Ave., Dallas, Texas 75203 HENLEY JOHNSTON & ASSOCIATES, INC. engineerhg geoscience consultants FI ELD COMPACTION TESTS PROJECT: HAVERTY'S DISTRIBUTION CENTER HJA JOB No.: 6641 CONTRACTOR: GILL EXCAVATING CO., INC. PROJECT No.: LOCATION: COPPELL, TEXAS DATE: /- ~a- ?~- LABORATORY FIELD TEST DATA COMPLIES ~ ~/~ ~.~¢/~ /z~ ~_ DATA DENSITY: A~M D ~ PROJECT AS~ D 698 MOIS~RE: AS~ D ~17~ SPECS. FIE~ OPT STD DRY % IDENT LOCA~ON / ~R MC DEN DEN MC DRY %S NO No. (%} (~ (~ (%) DEN PROJECT SPECIFICATIONS MOISTURE: ~NGE FROM 0 % TO + 4 % FROM OPTIMUM MOISTURE COGENT DENSI~: MINIMUM 95 % M~. DRY DENSI~ AT F~URE PAVING & BUILDING AREAS MINIMUM 90 % M~, DRY DENSI~ AT ~NDSCAPE AR~S COMPACTION METHOD: TECHNICIAN ENGINEER REPORT No. telephone (214) 941-3808 /l %h fax (214) 943-7645 SHEET ~- OF ~ 235 Morgan Ave., Dallas, Texas75203-1025