Loading...
DR9601-LR 960809Ellerbee-Walczak, Inc. CONSTRUCTION MATERIALS TESTING REPORT NO.: REPORT OF: FOR: PROJECT: DATE: TT067den.doc In Place Density Tests Utilizing Nuclear Gauge Tri-Tech Construction Gateway Business Park/ttaverty's 8/9/96 NO. PROC % MOIST. % DRY DEN LOCATIONS RCP LINE B 1 1 21.4 96.6 Sm. 2+49 2 2 20.9 98.6 Sra. 5+00 3 1 21.3 97.4 Sra. 8+50 PROCTORS USED: #1 - 100.7 PCF (~ 20.6% #2 - 100.6 PCF ~ 20.4% Tri-Tech Coppell-Gareth Campbell Albert Half Ronald A. Ellerbee, C.E.T. 6900 So, Freeway, Suite A-1 · Fort Worth, Texas 76134 Laboratory: (817)293-0111 * (817)293-0257 Fax: [817)596-0941