Loading...
Freeport NIP(7.0)-CS030410cost -it Fax Note 7671 Datell/0/03 pages From II t NDA. To At J� Co. /Dept. Co. Phone Phone Fax Fax of $15,878.95. T H E C 1 T Y •O F COPPELL MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Memo to Project and Fee Files From: Teresa Turner, E.I.T., Graduate Engineer Date: April 10, 2003 RE: Fire Meter Correction Duke Weeks, Freeport X (The Container Store) The fee assessment for the above referenced project incorrectly charged for two -10" fire meters and vaults. The approved plans however, specify one -10" and one -8" fire meter and vault. The only amount on the Development Fee Table that will change with the difference in one of the meter sizes is the Water Meter Fee (Irrigation/Fireline). The original Water Meter Fee for two -10" meters and vaults was $6,431.90. However, reducing the size of one of the meters tin 8" results in a difference of $918.23. The revised and corrected Water Meter Fee for this project is $5,513.67, which results in a corrected Total Development Cost cc: Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Interim Director of Parks and Recreation "CITY OF COPPELL ENGINEERING EXCELLENCE BY DESIGN"